BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Leavenworth, Washington. Completed plans call for site work for a bridge / tunnel.

Eagle Creek Culvert Replacement Estimated range of probable cost for the base bid and all additive bid items is $1,085,000.00- $1,325,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions during the bid process should be submitted to both Hannah hannah.pygott@co.chelan.wa.us and Bryan bryan.maloney@co.chelan.wa.us Eagle Creek Culvert Replacement Project, Chelan County, WA. This contract provides for the removal of four fish passage barrier culverts on Eagle Creek and the installation of four 3-sided pre-cast buried concrete box culverts between river-mile (RM) 0.4 and 0.6 on Eagle Creek. The four project sites are referred to throughout the Contract Plans and these Contract Provisions by the last name of the adjacent Landowner. From downstream to upstream, the sites are referred to as "Downs (Lower)", "Downs (Upper)", "Loreth", and "Morton". This work includes, but is not limited to installation, maintenance and restoration of temporary construction access routes and staging areas; temporary and permanent utility relocation; temporary traffic control as needed to safely deliver, handle, and stage equipment and materials; structure, channel, and roadway excavation; in-waterwork requiring site isolation, temporary diversion of streamflow, shoring and dewatering as necessary; temporary erosion and sediment control; design, procurement, and installation of the new crossing structures; streambed and bank restoration; construction surveying required to perform the aforementioned tasks; and all other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the WSDOT Standard Specifications for Road, Bridge and Municipal Construction and addenda thereto.

Award

Bridges / Tunnels

$804,556.00

Public - County

Site Work

34

8

3

5

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
24
Bidding Soon
300
All Active Projects
117
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2024

June 14, 2024

img_map_placeholder

Eagle Creek Rd, Leavenworth, WA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.