BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

This is a service / maintenance or supply contract in San Marcos, Texas. Contact the soliciting agency for additional information.

Vendors must register to download the RFQ documents. All addenda, etc. can only be downloaded at the above site. It is the Respondent's responsibility to check the site for the issuance of any addenda. Questions to this solicitation must be submitted in writing to the City of San Marcos Purchasing and Contracting Division only at mkruzelock@sanmarcostx.gov. Please reference the solicitation number when corresponding. This Request for Qualifications ("RFQ") identifies the City's minimum requirements. The successful Respondent will prepare an update to the adopted 2021 Master Plan for the City. The updates will center on updating the facility requirements, alternatives, and Capital Improvements Plan (CIP) chapters of the existing Master Plan based on aircraft fleet mix changes. Items of specific interest to the Airport include, but are not limited to: 1. Facility requirements: Analyze the capacity needs for an expanded fuel farm assuming larger aircraft operating at the airport. This will include benchmarking other airport locations serving larger aircraft. Furthermore review/inspect the existing electrical vault for the airfield and develop recommendations for future electrical improvements. 2. Alternatives: Analyze potential locations for a terminal building complex at the Airport. Potential locations will be based on the information found in the 2021 Master Plan. This includes but not limited to environmental considerations, roadway access, and available land parcels. Additionally, review roadway alternatives with alignments of how existing and future roadway infrastructure will connect to the preferred terminal location. This task may also include a traffic evaluation. Evaluate locations for the fuel farm and electric vault.

Conceptual

Transportation Terminals

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
42
Bidding Soon
2,337
All Active Projects
797
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.