Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Hastings, Nebraska. Completed plans call for site work for a water / sewer project.
Brief description of project: Contractor to supply all materials, labor, and equipment to install 250 linear feet of a 24" diameter, 0.375inch thick coated steel casing pipe under and across the BNSFRR Right of Way. Contractor to supply and install duct spacers through casing pipe from end to end. Contractor to install owner-furnished ducts (1-2" and 4-5") from end to end of casing pipe using contractor supplied duct spacers, no filling of casing pipe around ducts is required. Contractor to handle costs and coordination associated with Railroad Protective Liability Insurance, Flagging (Flagmen) and inspection/observation as are applicable and as required by BNSFRR. Contractor to leave bell holes open if necessary for owner to extend duct work. Owner will "fence" off open excavation. The location of this bore is across BNSFRR east of the UPRR tracks between U.S. Highway 6 and 7th Street R.O.W. in Hastings. Each bid shall be accompanied by a certified check, drawn on a solvent bank in the State of Nebraska, or a bid bond in an amount of not less than five percent (5%) of the total bid of all contract construction costs, made payable to the City Treasurer of the City of Hastings, Nebraska, as security that the bidder to whom the contract may be awarded will enter into a contract to build all the improvements in accordance with this notice and give bond in the sum hereinafter provided for the construction of improvements. No bid shall be withdrawn after opening of bids without the consent of the City of Hastings, Nebraska, for a period of sixty (60) days after scheduled time of closing bids. Time is of the essence in this contract. In evaluating bid(s) received, the City will consider the timelines of completion of prior construction contracts, existing workload of bidders and available manpower that bidder commits to the project. The successful bidder will be required to furnish a Performance Bond in the sum of the full amount of the Contract within ten (10) days of the date of award. No additional time will be allowed the Contractor for providing the Performance Bond. TECHNICAL QUESTIONS Tyler Waite, Coordinating Engineer City of Hastings 1228 N. Denver Avenue PO Box 289 (68902) Hastings, NE 68901 Ph# 402-462-3654 Email: bidquestions@cityofhastings.org Lee Vrooman, P.E. Director of Engineering City of Hastings 1228 N. Denver Avenue PO Box 289 (68902) Hastings, NE 68901 Ph# 402-462-3657 Email: bidquestions@cityofhastings.org GENERAL QUESTIONS OR REQUESTS Renae Griess Administrative Assistant - Engineering Dept, City of Hastings Ph# 402-462-3665 Fax# 402-462-3666 Email: bidquestions@cityofhastings.org
Award
Water / Sewer
$204,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 27, 2024
April 26, 2024
Multiple Locations, Hastings, NE
Related To This Project
Hastings, NE
Bid Date: Mar 12 2024
Hastings, NE
Bid Date: Apr 03 2024
Hastings, NE
Bid Date: Apr 10 2024
Hastings, NE
Bid Date: Apr 10 2024
Hastings, NE
Bid Date: Apr 02 2024
Hastings, NE
Bid Date: May 08 2024
Hastings, NE
Bid Date: May 01 2024
Hastings, NE
Bid Date: Aug 07 2024
Hastings, NE
Bid Date: Mar 20 2024
Hastings, NE
--
Hastings, NE
Bid Date: Mar 07 2024
Hastings, NE
Bid Date: Mar 07 2024
Hastings, NE
Bid Date: May 20 2021
Hastings, NE
Bid Date: Jun 12 2024
Hastings, NE
Bid Date: Feb 07 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.