BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Boulder, Colorado. Contact the soliciting agency for additional information.

trail maintenance for the entire 2.5-miles of the BCT. The trail begins at the mouth of Boulder Canyon and continues west to Four Mile Canyon Drive. The proposal will be for a five (5) year contract to cut and remove trail side vegetation encroaching into the 2.5-mile Boulder Canyon. The Boulder County Parks and Open Space Department (BCPOS) is seeking proposals for clearing trail side vegetaion encroaching into the trail corridor on the 2.4-mile Boulder Canyon Trail. Trail user safety is a priority for BCPOS, and these services are required to protect the high volume of visitors that frequent the trail system daily. Clearing the edge of the trail corridor will protect trail users from the hazards overgrown vegetaion creates. The successful vendor will clear trail side vegetaion along the Boulder Canyon trail a minimum one (1) time per year, but not to exceed a maximum two (2) times per calendar year. The frequency will be determined by the BCPOS department based on the timeframes and guidelines outlined below. The property is located at 40000 Boulder Canyon Drive. Question Deadline: 04/15/2024 at 2:00 PM MT, Location : Online portal. Americans with Disabilities Act (ADA): Americans with Disabilities Act: If you need special services provided for under the Americans with Disabilities Act (ADA), please contact the Boulder County ADA Coordinator or Human Resources office at (303) 441-3525 as soon as possible to allow sufficient time for service delivery ahead of applicable due dates. It is the responsibility of the selected Contractor to apply for and ensure the appropriate Contractor's license is obtained. General contractors, HVAC contractors, and roofing contractors require licensing through the Boulder County Community Planning and Permitting Department. Electricians and plumbers are 5 required to be licensed through the State of Colorado and registered with the Boulder County Community Planning and Permitting Department. Furthermore, it is required for all Architects, Professional Engineers, and Professional Land Surveyors to be fully licensed through the State of Colorado.

Post-Bid

Roads / Highways

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
66
Bidding Soon
897
All Active Projects
390
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2024

May 29, 2024

img_map_placeholder

Boulder Creek Path, Boulder, CO

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.