BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Detroit, Michigan. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and water / sewer project.

The Project: Northwest Inceptor to Oakwood CSO Sewer Construction This Project includes the construction of a 50-foot diameter and 50-foot deep drilled secant pile mining/launching shaft, a 50-foot diameter and 40-foot deep drilled secant pile diversion shaft (including 13' precut), 25-foot diameter and 50-foot deep drilled secant pile drop shaft (including 13' pre-cut), 25- foot diameter and 50 foot deep drilled secant pile connecting shaft, 14-foot diameter and 50 foot deep drilled secant pile manhole shaft, and a 10-foot finished diameter approximately 3,500-foot long segmental concrete-lined tunnel, installed using pressurized face Tunnel Boring Machine (TBM). The finished tunnel will connect the NWI to Junction Chamber No. 1 (JC #1) at the Oakwood CSO Control Facility in Detroit, MI. The Project includes various ancillary facilities and Work. Upon completion of this Project, the constructed shafts, gates, and tunnels that comprise the new NWI to Oakwood CSO Sewer will be used to provide flow diversion as necessary to the Oakwood CSO Control Facility during wet weather to help control surcharging in the NWI. This Project also includes the repair/replacement of two pinch valves located in Junction Chamber No. 1 on the dry weather flow channels. The Owner reserves the right to reject any Contractor that does not provide all the above complete information as part of their qualifications statement. In addition, the Owner reserves the right to reject any bidder that does not adequately demonstrate to the Owner, at the complete discretion and opinion of the Owner, these minimum qualifications stated above, based on the information provided by the Contractor, the information verified by the Owner or Owner's agent, and any other publicly available information. Question Deadline 05/06/2024 at 5:00 PM ET All questions must be sent through electronically Substantial Completion shall be 1,278 Days ; Final Completion shall be 1,461 Days from the start date specified in the Notice to Proceed Liquidated Damages - Milestone 1 = $600.00 Substantial Completion = $6,000.00 Final Completion = $3,000.00

Award

Water / Sewer

$73,508,929.00

Public - State/Provincial

Paving, Site Work

139

52

596

7

Subscribe For Documents

100 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
85
Bidding Soon
1,573
All Active Projects
635
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

June 24, 2024

img_map_placeholder

12220 Pleasant St, Detroit, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.