Site work for a civil project in Pennsville, New Jersey. Completed plans call for site work for a water / sewer project.

**As of September 19, 2024 this project has not yet been awarded. A timeline for award has not yet been established. The time for preparing bids shall be a minimum of 10 days from Notice to Bidders to receipt of Bids. This project is funded in part by the New Jersey Environmental Infrastructure Bank (NJIB) and the successful Bidder must comply with all the provisions of N.J.A.C. 7:22-9.1 et seq. for the participation of small business enterprises owned and controlled by socially and economically disadvantaged individuals (SED). The intent of this work is to remove and replace the existing feed pumping station that conveys wastewater to the sludge thickening process. In addition, a new 20ft diameter thickener tank, replacement of sludge feed pumping station and the construction of a thickened sludge removal pumping station, within fiberglass enclosure, within the Pennsville Sewerage Authority Waste Water Treatment Plant (WWTP). The thickened sludge will then be pumped from the sludge discharge pump station to the existing settling tanks, or travel via gravity lines back to the front of the plant. The Authority is proposing these improvements to the wastewater treatment plant in an effort to replace certain equipment that is reaching the end of its lifecycle and installing new equipment that will assist with reducing maintenance, and improve response time when equipment faults occur. Bids must be accompanied by a Certificate of Surety from an acceptable surety and a bid security in the form of a certified check, cashier's check or bid bond payable to the Pennsville Sewerage Authority in the amount of ten percent (10%) of the total bid amount, but not in excess of $20,000.00. The successful bidder must furnish a Performance Bond and Payment Bond, each in the amount equal to one hundred percent (100%) of the contract price. Said bonds must be in a form acceptable to the Pennsville Sewerage Authority and be issued by a surety authorized to do business in the State of New Jersey. The Pennsville Sewerage Authority will award the Contract or reject the bids within sixty (60) municipal days after the date of the bid opening. Should there be any reason the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Pennsville Sewerage Authority and the bidder. The Pennsville Sewerage Authority and the Engineer reserve the right to require a complete financial and experience statement from the prospective bidders showing that they have satisfactorily completed work of the nature required before furnishing proposal forms or specifications, or before awarding the contract. The Pennsville Sewerage Authority reserves the right to reject any and all bids in whole or in part, and to waive any informalities or minor defects therein, should it be deemed in the best interest of the Pennsville Sewerage Authority. The right is also reserved to increase or decrease the quantities specified in the manner designated in the specifications. Question Deadline 08/28/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Bid Results

Water / Sewer

$2,517,278.00

Public - City

Site Work

24

41

4

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Erection, Starting and Adjusting, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Vapor Retarders, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Other Specialties, Pest Control Devices
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures, Metal Building Systems
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters, Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Rodent Control, Soil Stabilization, Shoring and Underpinning, Vibroflotation and Densification, Densification, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Watering, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Fuel Distribution Utilities, Natural-Gas Distribution, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Hooks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
289
Active Projects
145
Bidding Soon
2,430
All Active Projects
1,040
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2024

October 4, 2024

img_map_placeholder

To Be Determined, Pennsville, NJ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.