BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a pre-engineered storage facility in Fergus Falls, Minnesota. Completed plans call for the demolition of a pre-engineered storage facility; for the construction of a pre-engineered storage facility; and for site work for a 16,580-square-foot pre-engineered storage facility.

Site Address: 1205 East Douglas Avenue City: Fergus Falls County: Otter Tail State/Province: MN Site Directions: Minnesota Department of Transportation Fergus Falls Truck Station 1205 East Douglas Avenue Fergus Falls, MN 56537 Otter Tail County Est. Value: $ 814,000.00 Est. Completion Date: Oct. 4, 2024 Pre-Bid Meeting Info: 1.01 PRE-BID MEETING INFORMATION: 1. NO PRE-BID MEETING This project has a 2% Targeted Group (TG), Economically Disadvantaged (ED), and Veteran-Owned (VO) Small Business (TG/ED/VO) subcontracting goals established. 1.03 SUMMARY OF WORK (see also Section 01 10 00 for additional information) A. The work will be done under one prime contract that includes: General construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Demolition of existing nominal 110'-8" wide by 120'-0" long fabric covered truss arch system, includes fabric and steel framing. 2. Construction of a nominal 125 feet wide by 120 feet long fabric covered steel framed building system, either truss arch or pre-engineered metal frame: includes engineering analysis, design and construction of foundation support and fabric covered steel framed system. Existing concrete walls to remain. 3. Engineering analysis and design a. Complete analysis and design within 30 days of the Notice to Proceed. C. Substantial Completion of the work shall be achieved on or before October 4, 2024, Work on site may not commence before May 15, 2024, and until all specified materials and equipment procurements are confirmed as complying with the Project Substantial Completion dates, unless authorized differently in writing by the MnDOT Project Manager. All questions must be submitted no later than three (3) business days prior to receipt of bids. The State is not obligated to answer questions submitted after the question due date and time. Question Deadline 03/14/2024

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$824,545.00

Public - State/Provincial

Demolition, New Construction, Site Work

13

15

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
11
Bidding Soon
107
All Active Projects
46
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2024

May 15, 2024

img_map_placeholder

1205 E Douglas Ave, Fergus Falls, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.