Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in North Little Rock, Arkansas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The Contractor shall complete all work as specified or indicated in the Contract Documents. The work is generally described as follows: The project consists of reworking College Park Drive and West 19th St. between Willow St. and Percy Machin Dr. College Park consists of lowering the centerline and installing sidewalk, curb and gutter, drainage, and reconstruction of concrete driveways. West 19th St. will be resurfaced and raised with the installation of curb and gutter along the northside of the street. Work includes all labor, materials equipment, supplies, and incidental items necessary to complete the project in conformance with the plans and specifications and related contract documents. Bid security in the amount of five (5%) percent of the Base Proposal must accompany each proposal as described in the Instruction to Bidders . All bidders shall comply with the requirements of the Contractor s Licensing Law of the State of Arkansas, and all applicable Arkansas regulations. All bonds on this project shall comply with Arkansas Statutory Performance and Payment Bond Law, Act 351 of 1953, as amended by Act 209 of 1957. The Owner reserves the right to reject any or all bids and to waive any irregularities. Proposals which fail to comply fully with the provisions of the specifications and other Contract Documents will be considered invalid and may not receive consideration. The right is reserved by the City of North Little Rock to reject any or all bids, in whole or part, or award items separately, or to waive informalities in bids received. The City of North Little Rock encourages participation from MBE/DBE/WBE and SBA vendors. No bid may be withdrawn for a period of sixty (60) days subsequent to date of the opening of Proposals and in accordance with the Supplemental Instructions to Bidders without consent of the Owner. Please direct all technical questions in writing to David Cook at dcook@nlr.ar.gov The Contractor shall complete all work as specified or indicated intheContractDocuments. The work is generally described as follows: The project consistsofreworking College Park Drive and West 19 th St. between WillowSt. andPercyMachinDr. College Park consists of lowering the centerline and installing sidewalk, curbandgutter, drainage, and reconstruction of concrete driveways. West 19thSt. will beresurfaced and raised with the installation of curb and gutter along the northsideofthestreet. Work includes all labor, materials equipment, supplies, andincidental itemsnecessary to complete the project in conformance with the plans and specificationsandrelated contract documents. Bid Result – Bid Schedule 1 Gene Summers $211,500. – Bid Schedule 2 Gene Summers $100,130
Bid Results
Water / Sewer
$311,630.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2024
April 29, 2024
College Park St, North Little Rock, AR
Related To This Project
North Little Rock, AR
Bid Date: Mar 20 2024
North Little Rock, AR
Bid Date: Mar 22 2024
North Little Rock, AR
Bid Date: Mar 28 2024
North Little Rock, AR
Bid Date: Mar 27 2024
North Little Rock, AR
Bid Date: Mar 26 2024
North Little Rock, AR
Bid Date: Mar 28 2024
North Little Rock, AR
Bid Date: May 06 2024
North Little Rock, AR
Bid Date: Apr 11 2024
North Little Rock, AR
Bid Date: Apr 02 2024
North Little Rock, AR
--
North Little Rock, AR
Bid Date: Mar 06 2024
North Little Rock, AR
Bid Date: Apr 25 2024
North Little Rock, AR
Bid Date: Mar 05 2024
North Little Rock, AR
Bid Date: Mar 05 2024
North Little Rock, AR
Bid Date: Mar 05 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.