Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Hoffman Estates, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The proposed work is officially known as the 2024 Street Revitalization Project #2, and is located on various streets inHoffman Estates. The proposed improvements include removing the existingpavement and curb and gutter, construction of curb andgutter, asphalt pavement and related improvements. Thedistance to be improved is approximately 12,349 feet (2.34miles) within 9 streets. All proposals must be accompanied by a proposal guarantyas provided in BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals contained in the "Supplemental Specifications and RecurringSpecial Provisions". The Village of Hoffman Estates strongly encourages minority firms and women's business enterprises to apply. Ifsubcontracts are to be let, the primary contractor shalltake these same affirmative steps to solicit bids from minority and women's firms. The Village of Hoffman Estates reserves the right to rejectany or all proposals and waive any informality in biddingand to accept the proposal deemed most advantageous toit, all in BLRS Special Provision for Contract Proposalscontained in the "Supplemental Specifications and Recurring Special Provisions". The improvements included in this Contract consist of furnishing all of the materials, labor and equipment required for reconstruction and resurfacing of various streets in Hoffman Estates and includes curb and gutter removal and replacement, concrete sidewalk removal and replacement, reconstruction of manhole structures, removal and replacement of sanitary sewer and storm sewer, abandonment and installation of watermain, pavement excavation, asphalt grinding, installation of stone, binder asphalt, surface asphalt, pavement markings, restoration of parkway areas, and together with all other incidental work necessary to complete this improvement according to the Plans, Standard Specifications and Special Provisions. SCOPE OF WORK The intent of the contract is to provide a complete outline of the work that the Contractor under- takes in full compliance with the plans and specifications. The Contractor shall perform all earthwork, construct all base and surface courses, structures, and such additional, extra, and incidental construction as may be necessary to complete the work to the finished lines, grades and cross sections in an acceptable manner. Due to budgetary constraints, the Village may increase or decrease contract quantities or remove locations of work. No compensation shall be provided to the contractor for any mobilization costs, specifically for changes to quantities.
Post-Bid
Roads / Highways
$4,000,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 18, 2024
May 17, 2024
Multiple Locations, Hoffman Estates, IL
Related To This Project
Hoffman Estates, IL
Bid Date: Mar 19 2024
Hoffman Estates, IL
Bid Date: Apr 26 2024
Hoffman Estates, IL
--
Hoffman Estates, IL
--
Hoffman Estates, IL
--
Hoffman Estates, IL
--
Hoffman Estates, IL
--
Hoffman Estates, IL
Bid Date: Mar 13 2024
Hoffman Estates, IL
Bid Date: Mar 13 2024
Hoffman Estates, IL
Bid Date: Mar 18 2024
Hoffman Estates, IL
Bid Date: Mar 14 2024
Hoffman Estates, IL
Bid Date: Aug 15 2024
Hoffman Estates, IL
Bid Date: Apr 22 2024
Hoffman Estates, IL
Bid Date: Feb 19 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.