BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 10, 2024 at 8:00 PM

Updated April 11, 2024

Site work and paving for a mixed-use development in Olympia, Washington. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Provide all labor, materials, and equipment, to asphalt pave the Department's Lake Whatcom Boat Launch, located at 3250 South Bay Drive, Whatcom County, Washington 98951 GPS Coordinates 48.673, -122.3157 in Whatcom County. Engineer's Estimate: $100,000 No pre-bid walkthrough is scheduled. Minority and Women's Business Enterprises (MWBE) are encouraged to participate in the bidding as prime contractors, subcontractors, or suppliers. Bid Bond: For bids of $35,000 or less, no bid guarantee is required. Bids greater than $35,000 shall be accompanied by a certified check, cashier's check, or bid bond payable to the Washington Department of Fish and Wildlife in an amount equal to at least five-percent of the bid as evidence of good faith and as a guarantee that, if awarded the Contract, the bidder will execute the Contract and give separate bond as required, see Section 00702.06. A. Base bids greater than $150,000; Contractor shall provide separate Payment and Performance Bonds, each executed by Contractor and Contractor's Surety. B. Base bids $150,000 or less, Contractor shall provide separate Payment and Performance Bonds, each executed by Contractor and Contractor's Surety, unless the Contractor agrees Owner may, in lieu of the bond(s), retain 10 percent of the Contract Sum for the period allowed by RCW 39.08.010. For information or technical questions regarding this project email CAMP.Bids@dfw.wa.gov with the project title and project number in subject line and address questions to the Project Manager. Questions resulting in changes to the scope or nature of the drawings, specifications, or bid documents will be answered by addendum/addenda reflective of the Owner's process. The Owner will NOT answer questions received after 2:00 p.m. on March 13, 2024. All addenda issued are part of the bid documents. The Owner will not be responsible for any oral interpretations.

Award

Sidewalks / Parking Lot

$72,249.00

Public - State/Provincial

Paving, Site Work

21

13

4

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
93
Bidding Soon
1,467
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2024

April 19, 2024

Project location map

To Be Determined, Olympia, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.