Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a water / sewer project in Port Orange, Florida. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
This project is for the construction of the Spruce Creek Fly-In Water Treatment Plant Improvements consisting of the installation of new motor control centers (MCCs) for the water treatment plant, construction of a building extension for housing the MCCs, replacement of an existing high service pump, and installation of Reverse Osmosis (RO) pretreatment piping, valves, and instrument modifications. This project includes all equipment, piping, fittings, valves, electrical, controls, instrumentation, and miscellaneous appurtenances specified and shown in the Contract Documents, necessary for system control and operation, hereafter termed "facilities". The "Contract Documents" shall consist of the County of Volusia Invitation for Bid, the Technical Specifications, and Construction Plans". "Work" shall consist of furnishing all labor, equipment, and materials for the construction and start-up / testing of the facilities. Materials with NSF approval shall be provided where directly or indirectly in contact with raw, intermediate treated, and final potable water. The Contractor shall furnish all supervision, labor, materials, power, light, heat, fuel, water, tools, appliances, equipment, supplies, and means of construction necessary for proper performance and completion the work. The Contractor shall obtain and pay for all required permits not specifically set forth in the Contract Documents. The Contractor shall perform and complete the work in the manner best calculated to promote rapid construction consistent with safety of life and property and to the satisfaction of the Owner, and in strict accordance with the Contract Documents. The Contractor shall clean up the work and maintain it during and after construction, until accepted, and shall do all work and pay all costs incidental thereto. The Contractor shall repair or restore all structures and property that may be damaged or disturbed during performance of the work. Question Submission Deadline:March 21, 2024, 11:59pm Estimated construction cost: $1,242,000.00
Post-Bid
Water / Sewer
$1,242,000.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2024
June 3, 2024
2A Taxiway Lindy Loop, Port Orange, FL
Related To This Project
Port Orange, FL
Bid Date: Apr 05 2024
Port Orange, FL
Bid Date: Apr 17 2024
Port Orange, FL
--
Port Orange, FL
--
Port Orange, FL
--
Port Orange, FL
Bid Date: Dec 10 2024
Port Orange, FL
Bid Date: Mar 22 2024
Port Orange, FL
--
Port Orange, FL
Bid Date: Mar 05 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.