BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in West Allis, Wisconsin. Completed plans call for site work for a water / sewer project.

**As of April 2, 2024, the project was awarded to VJS Construction Services, but the awarded amount is not available.** The Work generally consists of the following: 1. Excavation of soil in three separate areas of the Site: (A) the trichloroethene (TCE)-impacted area; (B) the lead-impacted area; and (C) the polychlorinated biphenyl (PCB)-impacted area. The excavation work is being conducted prior to the construction of the new West Allis Public Works Facility. The residuals will be loaded directly for off-site disposal at a licensed solid waste landfill. 2. Loading and hauling of excavated soil impacted with TCE, lead and PCBs. Contractor shall assume that the soil will be hauled to Waste Management's Orchard Ridge Landfill located at W124 N9355 Boundary Road, Menomonee Falls, WI 53051. Engineer's estimate of impacted soil for hauling and disposal is 6,800 tons. 3. Loading and hauling of stockpiled soil impacted with PAHs, low levels of metals and low levels of VOCs. Contractor shall assume that the soil will be hauled to Waste Management's Orchard Ridge Landfill located at W124 N9355 Boundary Road, Menomonee Falls, WI 53051. Engineer's estimate of impacted soil for hauling and disposal in a landfill is 30,200 tons. 4. Removal and closure of two underground storage tanks (USTs), one 700-gallon UST and one 2,200-gallon UST in accordance with API RP 1604 and Wisconsin Administrative Code ATCP 93.560. Up to 200 CY of petroleum impacted soil may be excavated and disposed of at a licensed solid waste landfill, if encountered. 5. Backfill and compact UST excavations, as directed by Engineer. 6. Dewatering of excavations, as needed. Water generated from dewatering operations shall be containerized, filtered and discharged into the Milwaukee Metrop Hauling of stockpiled impacted soils; hauling of inorganic materials; excavation, stockpiling, and hauling of impacted soils from specific site locations; and the excavation, removal, disposal, and filling of excavated areas of 2 underground storage tanks and related work All questions about the meaning or intent of the contract documents are to be directed to the City Engineer no later than 03/01/2024

Award

Water / Sewer

$557,160.00

Public - City

Site Work

3

13

6

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
56
Bidding Soon
1,301
All Active Projects
566
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2024

May 15, 2024

img_map_placeholder

1906 S 53rd St, West Allis, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.