BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2024 at 8:00 PM

Updated May 4, 2024

Demolition, site work, new construction, renovation and addition to an educational facility in Morristown, Tennessee. Completed plans call for the addition of a educational facility; for the demolition of a 157,311-square-foot educational facility; for site work for a educational facility; for the renovation of a 16,838-square-foot educational facility; and for the construction of a 6,178-square-foot educational facility.

A. Furnish all labor, materials and equipment, and perform all work for the improvements as specified herein and shown on the accompanying drawings. B. Verbal Summary: Without force and effect on requirements of the contract documents the description of the work of the Contract can be summarized as follows: 1. Project Name is Hamblen County Schools - Hamblen-Morristown West High School - CTE Addition. The Work is comprised of 2. Addition to the CTE classrooms/shops area. 3. Installation of new HVAC systems in each classroom/shop area. 4. Installation of new shop equipment. 5. Installation of two new automobile lifts. C. Provide selective demolition of the existing structure as indicated, construct newaddition, and repair and replace adjacent surface finishes as described in the plans. The Hamblen County Department of Education is seeking bids for the following: The addition for the Career and Technical Education (CTE) Wing at Morristown-Hamblen High School West, 1 Trojan Trail. HCBOE reserves the right to accept or reject any and/or all bids. Direct inquiries to Hugh Clement, Assistant Superintendent at 423-581-3118.

Post-Bid

Educational

$300,000.00

Public - County

Addition, Demolition, New Construction, Renovation, Site Work

39

16

10

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
0
Bidding Soon
629
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

June 3, 2024

Project location map

1 Trojan Trail, Morristown, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.