Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 13, 2024 at 8:00 PM
Updated October 1, 2024
Renovation of a mixed-use development in Erie, Michigan. Conceptual plans call for the renovation of a educational facility.
April 1-2, 2024 . . . . . . . . . . . . . . . . Optional Bidder interviews April 3, 2024 . . . . . . . . . . . . . . . . Board of Education selects an Architect and authorizes the Superintendent to finalize a contract. April 22, 2024 . . . . . . . . . . . . . . Architect begins work. Questions Concerning this RFP Inquiries may be made to Kelli Tuller at the address above, via telephone at (734) 848-9304 or via email at ktuller@eriemason.k12.mi.us. Information about the District is available during business hours (8:00 a.m. - 4:00 p.m.) Scope of Services It is assumed that any proposal submitted will include, but shall not necessarily be limited to, the performance of all services identified in this section, elsewhere in the RFP, and as set forth in the form of Agreement attached as Attachment "A." The District will consider alternate proposals. However, any alternate proposals must clearly indicate any activities that have been deleted and/or added from the requested scope of services. References to the "Architect," "Engineer," "Designer," "Bidder," "Proposer," "firm," or other similar term shall all be intended to refer to the entity submitting a response to this RFP. 1. Pre-Design Phase Services a. Conducting a full facilities review with the District and potentially the Construction Manager. b. Assist in developing a construction program and project scopes and establishing an estimated cost of each desired improvement in accordance with MCL 339.2011 (which cost estimating obligation shall continue after programming). c. Assist in determining the estimated cost of the desired improvements and in sizing the Project. d. Attend meetings and make presentations concerning the proposed Project. e. Assist the District in the development of the District's construction program and Project scope. 2. Design Phase Services a. Develop Preliminary Design including, but not limited to, Space Planning, Schematic Design and Design Development specific to the Project. b. Complete Final Design including, but not limited to, working drawings, specifications, cost estimates, prospective bidders list, approvals (State and local authorities), technical addenda and clarifications for all of the following, as applicable for each particular project: i. Landscape/Site Design ii. Structural Design iii. Architectural Design iv. Mechanical Design v. Electrical Design vi. Civil Design vii. Theater/Stage/Lighting Design viii. Acoustical Design ix. Technology Design and Procurement x. Energy Efficiency Design xi. Playground Design xii. Traffic Engineering c. Attend meetings with each committee to develop goals, explain options, and reach consensus on final plans. d. Provide copies of meeting minutes for distribution to appropriate staff and Board members. e. Review the construction schedule and recommendations for appropriate bidding categories and phases. f. Review an occupancy schedule to be implemented upon completion of construction. g. Produce and review projected cash flow schedules for all aspects of the Project. h. Review commissioning options with District and incorporate appropriate commissioning duties into the plans and specifications. i. Provide necessary cost estimates to satisfy statutory requirements and to permit the Architect to perform basic services. 3. Bidding Phase Services a. Complete bid package of all required construction documents and specifications, including reproduction of same. b. Develop the necessary advertising for bid document distribution. c. Assist District with creating all possible contractor interest in bidding and performing this work. d. Prepare and distribute construction documents to bidders. e. Participate in pre-bid conferences with all bidders for each division of work. f. Assist in evaluating bids in each work category. g. Participate in post-bid interviews with apparent low bidders. h. Develop award recommendations to District. i. Review all trade contracts and associated documents. j. Advise District as to necessary building permits and other governmental agency approval applications. 4. Construction Phase Services a. Provide on-site observation and supervision of construction in satisfaction of the requirements of 1937 PA 306 and 1980 PA 299, including supervision and site visits as necessary during the entire construction period. b. Continually monitor and update construction, construction draw, and occupancy schedules. c. Prepare change order requests, and receive District approvals. d. Review shop drawings and expedite the review process. e. Review payment and cost control procedures, including the following: i. Contractors' Schedule of Values ii. Contractors' Payment Application and Certification iii. Contractors' Sworn Statements and Waivers of Lien, if applicable iv. Purchase Order and disbursement Summaries v. Change Order Listings vi. Budget Cost Summary Reports f. Participate in progress meetings and provide progress reports of same. i. As needed, meet with the building principal to discuss any activities which may affect operations. ii. Weekly meeting with District representative and trade contractors. iii. Monthly meetings for planning, coordination, and payments with District administrators which will include status reports on the Project, budget, change orders, and allowances for reimbursable expenses. g. Prepare as-built drawings and record and review operating and maintenance manuals, warranties, guarantees, and Project directories. h. Ensure that all construction is completed as specified by the construction documents and meets all codes and regulations of agencies having jurisdiction. i. Provide review and coordinate Project commissioning, including but not limited to mechanical and electrical systems. j. Prepare punch lists, coordinate final inspections, and recommend District acceptance and occupancy. 5. Post-Construction Phase Services a. Assist in facilitating/requiring training sessions for appropriate employees regarding the operation and maintenance of technical equipment. b. Provide follow-up and call-back services for the duration of the longest warranty period covered by a contractor on the Project. c. Conduct a post-occupancy walk-through appropriately timed to address Project issues prior to expiration of applicable warranties. d. When requested, advise and assist the District with special and/or additional services beyond the scope of basic services.
Conceptual
Educational
$250,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 22, 2024
Multiple Locations, Erie, MI
Related To This Project
Erie, MI
Bid Date: May 29 2024
Erie, MI
Bid Date: Jun 05 2024
Erie, MI
Bid Date: Jun 06 2024
Erie, MI
--
Erie, MI
Bid Date: Feb 05 2025
Erie, MI
Bid Date: Oct 02 2023
Erie, MI
Bid Date: Sep 29 2023
Erie, MI
Bid Date: Feb 18 2022
Erie, MI
Bid Date: Aug 22 2023
Erie, MI
Bid Date: Aug 01 2023
Erie, MI
Bid Date: May 31 2023
Erie, MI
Bid Date: Jun 02 2023
Erie, MI
Bid Date: Jun 28 2022
Erie, MI
Bid Date: May 26 2022
Erie, MI
Bid Date: Jul 15 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.