EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 16, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Island Lake, Illinois. Completed plans call for site work for a water / sewer project.

Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a grant awarded by the U.S. Environmental Protection Agency as a Community Grant and a grant awarded by McHenry County from its American Plan Rescue Act Allocation. In addition, this project is being supported, in whole or in part, by federal award number B22-UC17-0007 awarded to the Northern Moraine Wastewater Reclamation District by the U.S. Department Housing and Urban Development - Community Development Block Grant Program. Neither the State of Illinois, United States, McHenry County, nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. The procurement will be subject to regulations contained in the Methods of Procurement and Grants and Other Federal Assistance from the Code of Federal Regulations (40 CFR Subchapter B Part 33 and CFR Part 200.320), the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), the "Use of American Iron and Steel" requirements as contained in Section 436 of H.R. 3547, and the Consolidated Appropriations Act, 2014. This procurement is also subject to the grant recipient's policy regarding the increased use of disadvantaged business enterprises. The grant recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. Any publications must include specific language found in Specification Section 00 31 17 - CDBG Grant Guidelines. Bidders are also required to comply with Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60-4. 1. 6,230 LF of Sanitary Sewer along Pine Street and Northeast Shore Drive within the Village of Holiday Hills and throughout the Le Villa Vaupell Subdivision. 2. Culvert Removal and Replacement. 3. Pavement Patching. 4. Restoration with Seed. 5. Erosion and Sediment Control Measures. Addenda will be issued only to plan holders. Questions should be directed to Jeremy Plank, P.E. (630) 587-0470, j.plank@trotter-inc.com. The contractor shall pay prevailing wages in accordance with the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the U.S. Department of Labor, Local Ordinance and the Illinois Department of Labor Prevailing Wages for McHenry and Lake Counties, whichever is greater. Final award of bid shall be contingent on the Northern Moraine Wastewater Reclamation District receiving financing from the United States Environmental Protection Agency and other federal pass-through grant funds provided by McHenry County. Per the USEPA's Code of Federal Regulations, unless all bids are rejected, award shall be made to the low, responsive, responsible bidder after the bid evaluation has been submitted to the USEPA and written notice of USEPA approval has been received by the Northern Moraine Wastewater Reclamation District.

Award

Water / Sewer

$4,060,303.00

Public - City

Site Work

45

18

12

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Joists
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Escalators and Moving Walks, Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
316
Active Projects
204
Bidding Soon
2,653
All Active Projects
1,274
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2024

June 4, 2024

img_map_placeholder

Multiple Locations, Island Lake, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Holiday Hills/ Le Villa Vaupell Sewer Extension - Phase 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.