BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling and renovation of a municipal facility in The Dalles, Oregon. Completed plans call for the remodel of a municipal facility.

JLL/BPA Celilo Hydrant Star Complex project. Background: Big Eddy HMEM Facility building fire protection system consists of dry pipe fire sprinkler system and a fire hydrant: Muller 5-1/4 outside of the HMEM building. The dry pipe fire sprinkler and the fire hydrant are currently inoperable. Potentially due to water pipe supply connection from the storage tanks that were disconnected during a previous Celilo yard expansion. The dry pipe sprinkler system water requirements for this building are based on NFPA 13 for Ordinary Hazard Group 2 with a design criterion of 0.20GPA/1,950sf. Max protection area is 130sf with a maximum sprinkle spacing of 15 feet. The HMEM has a total of 72 sprinklers with six (6) branchline piping runs into the building. Currently, there is a 1-inch domestic water supply connected to a 4-inch potable water line from the above mentioned storage tank. Additional Information: The City of The Dalles Public Works Department confirmed that the existing 8" water main terminating at the fire hydrant near the residential area on Columbia View Dr does NOT provide code compliant pressure for the proper operation of the existing 5 1/2 " Muller Fire Hydrant located at the HMEM building A flow test was conducted by Fire United on 12/28/21 and indicated that there is not a viable water supply connected to hydrants 7,8,9,10, or 11. Flow test results for hydrants 2, 3, 4, and 5 would indicate that the underground water main noted as 10" HDPE on plan 269869 sheet 1 of 1, rev 1 dated 11/2019 has been installed and was in service at the time of the flow testing conducted on 12/28/2021 by United Fire. Figures for both are below.

Post-Bid

Municipal

$500,000.00

Public - Federal

Remodeling, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
14
Bidding Soon
369
All Active Projects
172
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2024

April 29, 2024

img_map_placeholder

1500 The Dalles-California Hwy, The Dalles, OR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.