BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Harrison, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Harrison 2024 Asphalt Street Resurfacing Program The work shall consist of pulverizing 7,800 linear feet of existing asphalt pavement, fine grading and placement of 9,250 tons of new HMA pavement along Amy Avenue (from State Park Road, east approximately 500 linear feet), the streets located within the Woodland Trails Subdivision, including Spring Valley Road, Shagbark Hickory Lane, Sugar Maple Way, Maple Bluff Lane, Hemlock Lane, Wild Cherry Court, and Box Elder Way, and Payten Street (from Evan Street to State Park Road). Additional work to include miscellaneous base repair, approximately 2,900 linear feet of spot curb and gutter replacement, and fine grading and paving approximately 400 linear feet of recreation trail located in Clover Ridge Park. The Village of Harrison has received LRIP funding for Payten Street Construction, from Evan Street to State Park Road. Work to include pulverizing approximately 2,400 square yards of existing asphalt pavement, installing 130 linear feet of storm sewer, 1,200 linear feet of mountable concrete curb and gutter, 500 tons of new HMA pavement and 2,000 square yards of lawn restoration. All questions about the meaning or intent of the Contract Documents shall be submitted to the ENGINEER in writing. Replies will be issued by Addenda. Questions received less than 5-days prior to the date for opening of Bids will not be answered

Bid Results

Roads / Highways

$1,118,264.00

Public - City

Paving, Site Work

13

15

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
19
Bidding Soon
504
All Active Projects
227
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2024

May 13, 2024

img_map_placeholder

Multiple Locations, Harrison, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.