Site work for a civil project in Arthur, North Dakota. Completed plans call for site work for a water / sewer project.

**As of May 14, 2024, the project was awarded to KPH Inc., but the awarded amount is not available.** Pearson Ponds Addition 13,800 CY Common Excavation 4800 LF 6 PVC Watermain 2700 LF 8 PVC Sanitary Sewer 1000 LF RCP Storm Sewer 635 LF 4 PVC Forcemain 3700 CY Aggregate Base Class 5 298 LF 4 PVC Forcemain, HDD 1 Lump Sum Sanitary Lift Station 1 Lump Sum Sanitary Lift Station Questions received less than seven days prior to the date for opening of Bids may not be answered. Question Deadline 03/14/2024 SCOPE OF TESTS A. All materials, equipment, installation, and workmanship included in this contract, if so required by the Engineer, shall be tested and inspected to prove compliance with the contract requirements. B. All tests and inspections shall be completed under the direct supervision of a licensed professional engineer. All tests and inspections shall be the responsibility as identified in the individual sections of these specifications and shall be reported directly to the Owner and Engineer. C. No tests specified herein shall be applied until the item to be tested has been inspected and approval given for the application of such tests. D. Tests and inspections shall include all those specified in the individual sections and shall be compensated in accordance with the individual sections. E. Tests and inspection, unless otherwise specified or accepted, shall be in accordance with the recognized standards of the industry. F. Soil compaction testing performed by the Owner is deemed to be for the convenience of the Owner for documentation of the progress and performance of the work. Soil compaction testing results will be made available to the Contractor. However, the Owner and Engineer make no representations that the number of tests taken will be sufficient to accurately characterize the condition of any trench, and the Contractor shall take any supplemental test it deems necessary to monitor its own performance. The Owner may, at its discretion, eliminate soil and compaction testing on any part or the entire project. The presence or absence of soil and compaction testing or the approval of the results thereof shall in no way reduce the Contractors obligation to correct trench settlement as described in these Special Provisions.

Award

Water / Sewer

$1,642,459.00

Public - City

Site Work

50

17

22

5

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
18
Bidding Soon
248
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

May 20, 2024

Project location map

Multiple Locations, Arthur, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.