BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

New construction of an educational facility in Bellefonte, Pennsylvania. Completed plans call for the construction of a 78,152-square-foot educational facility.

The project is comprised of the following Prime Bid Contracts: Prime Contract 1 - General Construction Prime Contract 2 - Casework Construction Prime Contract 3 - Food Service Construction Prime Contract 4 - Fire Protection Construction Prime Contract 5 - Plumbing Construction Prime Contract 6 - HVAC Construction Prime Contract 7 - Electrical Construction The project consists of construction of a new elementary school including all associated site development work including the following: All sitework including a new parking lot, temporary fencing and site controls, E&S, site demolition, site grading, concrete curbs, and sidewalks. Permanent fencing, dumpster enclosure, site utilities and landscaping. Construction of new building including concrete, masonry and steel work, waterproofing and air barriers panels, exterior framing, composite wood panels, and metal wall panels. Glu-lam beams, wood blockings, millwork, educational casework, and display cases. Roofing, roof screens and hatches. All doors, frames and hardware, aluminum entrances and storefront, aluminum windows, hollow metal windows, curtain wall, borrowed lites, all glass and glazing, interior drywall partitions, ceilings, wall and floor finishes, painting, all division 10 items, food service equipment, athletic equipment, bleachers, stage rigging and curtains, visual displays, window treatments and elevators are included. Fire Protection including a complete automatic wet sprinkler system throughout the building with a separate fire pump building feed and an underground water storage tank. The plumbing shall provide storm, sanitary, vent, domestic cold, hot, and hot water return piping throughout the building. New natural gas line shall serve the mechanical room equipment as well as the kitchen. The domestic water system shall have a water softener and booster pump integral to the system. The HVAC system shall provide a 4-pipe system to rooftop mounted unit that provide ventilation and dehumidification to the building. The heating plant shall contain natural gas condensing boilers using primary pumps to distribute hot water throughout the building. The Chilled water plant shall contain an exterior mounted air-cooled chiller using primary pumps to distribute a propylene glycol solution throughout the building. A VAV system shall be used to distribute air flow around the building. The controls shall use a DDC system to monitor and control the mechanical equipment. Electrical work including primary conduits for electrical service. Transformer vault with conduit and electrical feeders to the main distribution panel. The installation of the communications conduits. The 277/480 Volt 2000 Amp main distribution panel shall provide breakers for remote panelboards to service power throughout the building and site. A 200kw 250kva emergency generator on a concrete foundation. Transfer switches will provide for emergency power throughout the building. LED site poles will be positioned around the parent/staff parking and the bus parking loop. The elementary will have LED lighting throughout with recessed fixtures, linear hung fixtures, and accent fixtures. Dimming controls will be used in classrooms, office rooms, and with additional learning areas. Complete fire alarm system including all devices, conduit, boxes, cable, annunciator and main panels. Main distribution frame (MDF) will be centrally positioned to allow proper distribution of network cabling. Intermediate frame (IDF) will be located with each education wing for evenly distributed cabling to data locations. Security shall be utilized with a secure entrance with intercom connections to the office. The exterior doors will have card access with door contacts. Exterior and interior camera system will be provided. Motion sensors will be located throughout the elementary. Prime Bidders' proposals must be accompanied by a certified check, certified bank treasurer's check, bank cashier's check, or bid bond in the form included with the bidding documents. A satisfactory corporate surety shall provide security in an amount equal to 10% of the base bid together with the aggregate sum of all additive alternates. The surety shall name as payee or obligee the Bellefonte Area School District. Notice is hereby given that the New Bellefonte Elementary School for which construction proposals are being solicited hereby is a construction project constructed by a public entity constituting public works and is subject to applicable provisions of the Pennsylvania Human Relations Act, the Pennsylvania Prevailing Wage Rates, and other applicable Acts. All proposals shall be irrevocable for sixty (60) days after bid opening date, unless delayed due to required approvals of another governmental agency, sale of bonds, or the award of a grant or grants, in which case bids shall be irrevocable for one hundred twenty (120) days. The Owner reserves the right to reject any or all bids and to waive any or all informalities, defects, errors, omissions, mistakes, or irregularities in proposals, to reject any or all proposals or parts thereof and to make awards as may be deemed in its best interest. Please email requests for information to: KCBA: Jason Monroig at jason.monroig@kcba-architects.com and SitelogIQ (SIQ): KC Lyons at Kenneth.lyons@sitelogiq.com, Jen Sariano at jennifer.sariano@sitelogiq.com, and Dewanna Laning at dewanna.laning@sitelogiq.com Questions will be accepted until 2:00 PM, Thursday, April 25, 2024. All addenda, except addenda extending the bid deadline, will be issued no later than Monday, April 29, 2024 end of day

Post-Bid

Educational

$40,853,396.00

Public - City

New Construction

330

33

94

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
23
Bidding Soon
448
All Active Projects
183
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2024

May 22, 2024

img_map_placeholder

830 E Bishop St, Bellefonte, PA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.