BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Wheat Ridge, Colorado. Completed plans call for site work for a playground / park / athletic field.

Reference Number 0000344892 Estate Fence installation at Paramount Park - New estate fence will be placed approximately 5 foot west of existing Kipling sidewalk. The fence face will be on the east side of the posts. Rails will be on the east side of the fence. Fence will be field located at preconstruction meeting. Question Acceptance Deadline 03/20/2024 02:00 PM MT Questions are submitted online Yes, please direct questions to contact as listed below. City of Wheat Ridge Procurement Attn: Whitney Mugford-Smith wmsmith@ci.wheatridge.co.us Anticipated Start Date: April 2024 Weather Permitting Required Project Completion: June 28, 2024 Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Award Requirements - All or None Award Bonding Requirements - Performance Bond 100 % The City reserves the right to the following Reject any and all proposals. SCOPE OF WORK Site Conditions The contractor will be responsible to meet and call 811 for locates for the project. The city will mark all private locates. The contractor will minimize damage to the site, including turf. Work will be staged from sidewalk. All equipment and trailers will stage from sidewalk. All employee parking will be in the south parking lot adjacent to the softball field. Work that will damage turf will have the contractor put down plywood under the equipment tires/track to minimize turf damage. The contractor will clean the entire site daily. Do not track any mud/debris onto any street. If tracking occurs the contactor will clean the road/street within 4 hours of the original request to the satisfaction of the city representative. The site will be returned to preconstruction conditions. The contractor will protect the entire site and all materials from all weather and temperature damage. The city will not accept any damaged or vandalized work. Magnet sweep work area daily.

Post-Bid

Playgrounds / Parks / Athletic Fields

$45,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
38
Bidding Soon
1,003
All Active Projects
422
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

April 1, 2024

img_map_placeholder

10010 W 29th Ave, Wheat Ridge, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.