BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Brighton, Colorado. Completed plans call for site work for a municipal facility.

As of May 3, 2024 project was awarded to Land Ethics LLC, but awarded amount is not available. Adams County (County) is seeking responses from qualified firms for Construction Services for the expansion of the irrigation system, including switching the water source from potable to non-potable as described in the scope of work. The Adams County Animal Shelter is located at 12155 Park Boulevard, Brighton, Colorado 80601. TERM OF AGREEMENT: This is a one-year agreement. Question Deadline 03/18/2024 at 5:30 PM MT Questions are submitted online No PROJECT DESCRIPTION: The Riverdale Animal Shelter Irrigation Expansion project will include expansion of the existing irrigation system, installation of a pump system and switching from a potable water source, (the existing water tank) to a non-potable water source (the Lower Clear Creek ditch). Please note, all construction inside the ditch right-of-way including the headgate/turnout structure will be constructed by Adams County. All areas disturbed by construction activities will be repaired, reseeded, resodded. Installation of the pump system will include but is not limited to the following, installation of the pump, pump components, commissioning the pump and an electrical service originating from the electrical room inside the animal shelter or search for a simpler method to provide electricity. For the irrigation system expansion, the contractor shall provide all labor, products, materials, associated materials (weather specified or not), equipment, transportation, and supervision required to expand the irrigation system including but not limited to: 1. Valves, mechanical and electric 2. Field and electrical wiring 3. Electrical work 4. Piping, mainline and lateral 5. Sprinkler heads, quick coupling valves, controller devices, drip irrigation 6. Re-Grade, re-sod, re-seed, repair areas disturbed by construction 7. Concrete replacement (if needed) 8. Asphalt Repair/Replacement (if needed) 9.Directional boring (if needed) 10. Coordination of electrical and other permits and inspections as required 11. Other items as necessary to complete the work per the contract documents

Award

Municipal

$213,770.00

Public - County

Site Work

14

6

16

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
36
Bidding Soon
0
All Active Projects
386
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2024

May 1, 2024

img_map_placeholder

12155 Park Blvd, Brighton, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.