BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2024 at 8:00 PM

Updated June 21, 2024

Site work for a bridge / tunnel in Greenwood, Ontario. Conceptual plans call for site work for a bridge / tunnel.

Pickering Museum Village pedestrian bridge rehabilitation or replacement, located 150m west of Greenwood Rd. Teh bridge is 25m long and 2.4m wide. TIMELINE: An RFP for engineering to complete detailed design has been cancelled by the owner. Coverage has been discontinued at this time.

Project Abandoned

Bridges / Tunnels

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
470
Active Projects
199
Bidding Soon
4,834
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2025

Project location map

3550 Greenwood Rd, Greenwood, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.