BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Santa Maria, California. Working plans call for site work for a water / sewer project.

**As of April 23, 2024 bids received for this project were over the budget and was rejected. As of this time it is unknown if and when project will rebid. Q&A Deadline : 03/26/2024 5:00 PM (PDT) All questions regarding this solicitation shall be directed through Online Scope of Services SMBSD is seeking bids from qualified contractors with demonstrated experience in providing similar Storm Drain Installation Services per approved specifications. The Scope of Work consists of: Demo of existing flatwork, new Storm Drain Pipe placement, backfill per trench detail, and related work as specified on the Contract Documents and Specifications/Scope of Work. Fairlawn ES, 120 N. Mary Drive, Santa Maria, CA 93458 Adam ES, 500 W. Windsor Street, Santa Maria, CA 93458 License Requirements A, B, C-36, C-42 or other applicable CSLB Applicable License Liquidated Damages $250 per day Start/Delivery Date Anticipated Start: 06/10/2024 Project Duration 45 Calendar Days Project Type IPWB (Informal Public Works Bid) Response Types Line Items , Bid Proposal Form and Required Certificates (required) ,Supplemental information Type of Award Lump Sum This allows the School District to informally Bid small construction and maintenance projects with estimated costs of $60,000 to $200,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bids must be accompanied by a Bidders bond, cashiers check, or certified check for at least ten percent (10%) of the amount of the base Bid and made payable to the Owner. The successful Bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the contract price, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the contract price. The District reserves the right to reject any and all proposals and to waive irregularities or informalities in any submission or in the solicitation process.

Final Planning

Water / Sewer

$78,752.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
15
Bidding Soon
249
All Active Projects
109
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2024

October 23, 2024

img_map_placeholder

Multiple Locations, Santa Maria, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.