Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published March 7, 2024 at 7:00 PM
Updated April 4, 2024
This is a service / maintenance or supply contract in Berwyn, Illinois. Contact the soliciting agency for additional information.
Scope of Work o Weekly grass cutting, string trimming and edging from April 22ndst through July 12th, every two weeks from July 15th through August 30th, then weekly from September 2nd through November 23rd, 2024. As a part of each grass-cutting event, all yard waste is to be picked up and properly disposed of by the contractor. (All debris/litter must be picked up prior to grass cutting.) o Trimming and weeding of shrubs and bushes and flowers planted in permanent planter boxes every two weeks. o Trimming and weeding of center median planters every two weeks. o Weekly removal of waste and debris/litter/dead plantings from all permanent planter boxes and center median planters. o Fertilizing, application of weed control and watering of grass and plants within the parkways (not including permanent planters) to ensure healthy growth (minimum of three times a season for all but watering; watering within the parkways should be done weekly). o Water in-ground flower beds (29 within Cermak Rd. excluding center medians which contain irrigation) a minimum of 3 times per week or more often as necessary in order to maintain plant health during the season. Watering is from May 27th through October 11th. o Weekly removal of weeds and monthly application of vegetation killer in all paver bricks and concrete walkway areas are required. o Irrigation systems shall be energized and maintained by a third party and is NOT part of this contract. o All public trash receptacles shall be emptied and bags replaced weekly on Mondays and Fridays during the duration of the contract. (Notify Public Works when completed.)
Post-Bid
Roads / Highways
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2024
April 22, 2024
Multiple Locations, Berwyn, IL
Related To This Project
Berwyn, IL
Bid Date: Mar 28 2024
Berwyn, IL
Bid Date: Mar 28 2024
Berwyn, IL
Bid Date: Apr 11 2024
Berwyn, IL
Bid Date: May 31 2024
Berwyn, IL
Bid Date: Jun 26 2024
Berwyn, IL
Bid Date: Aug 27 2024
Berwyn, IL
Bid Date: Sep 19 2024
Berwyn, IL
Bid Date: Oct 08 2024
Berwyn, IL
Bid Date: Feb 15 2024
Berwyn, IL
Bid Date: Feb 15 2024
Berwyn, IL
Bid Date: Jan 11 2024
Berwyn, IL
Bid Date: Jan 29 2024
Berwyn, IL
Bid Date: Jan 17 2024
Berwyn, IL
Bid Date: Jan 16 2024
Berwyn, IL
Bid Date: Nov 01 2023
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed