Published May 4, 2024 at 8:00 PM

Updated May 5, 2024

Site work for a transportation facility in Springfield, Ohio. Completed plans call for site work for a transportation facility.

WESTCO 2024 Track Rehabilitation Project - The 2024 Rehab project includes tie distribution, installation, and disposal, surfacing, ballast, anchors, spikes, bolts, and other misc. track components. The project also involves the tie deck replacements on two bridges on the line (MP 1.42 and MP 10.01). Maintain track as Excepted Track (10 MPH) for the length of the Mechanicsburg Sub. 1. Remove and replace 4,800 ties and dispose of scrap ties 2. Distribute and place 1,500 tons of ballast 3. Surface 17 miles of track 4. Tie deck replacements on bridge 1.42 (138 ties) and 10.01 (53 ties) 5. Install misc. items as needed (plates, spikes, anchors) 6. Various related items per Specifications The Mechanicsburg Subdivision is operated by the Indiana & Ohio Railway Company (IORY). All work by the contractor must be coordinated with the IORY. The Mechanicsburg Subdivision is owned and maintenance by the West Central Ohio Port Authority. WESTCO's offices are located at 3130 E. Main Street, Suite 2B, Springfield, Ohio 45505. PROJECT SCHEDULE The Mechanicsburg Subdivision is used as-needed by the IORY. It is anticipated that work on this project will be largely uninterrupted. The Mechanicsburg Sub has one customer (Heritage Cooperative) and they ship infrequently (approximately 500 carloads per year). While uninterrupted work is largely anticipated during this project, this schedule is subject to change and will be confirmed prior to work commencing. Specific work windows will need to be coordinated with the IORY. It is envisioned that the "Notice-to-Proceed" will be issued on or about May 16, 2024 upon execution of the contract. Actual track time must be arranged with the IORY. All work must be completed by December 31, 2024 unless interim progress is approved by WESTCO. Bids must be accompanied by a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security furnished in Bond form shall be in the full amount of the bid. The bond must be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. Bid security furnished in the form of a certified check or cashier's check, shall be equal to 10% of the bid. Checks should be made payable to the West Central Ohio Port Authority. Failure to submit a proper Bid Guaranty automatically invalidates the bid.

Bid Results

Transportation Terminals

$781,484.00

Public - City

Site Work

4

6

2

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
305
Active Projects
129
Bidding Soon
2,593
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

May 16, 2024

Project location map

Multiple Locations, Springfield, OH

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed