BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Mountain View, California. Completed plans call for site work for a water / sewer project.

The work to be performed under this contract consists of the following project elements: 1. Selective demolition of existing electrical and instrumentation materials and equipment, including existing variable frequency drive (VFD) interior equipment, and salvage of wiring, conduits, and enclosures for new installation. 2. Pump Station Electrical Improvements: Replacement of three (3) one hundred fifty (150) horsepower VFDs using existing VFD enclosure. Replacement of one (1) forty (40) horsepower VFD using existing VFD enclosure. Replacement of remote telemetry unit (RTU) panel. Installation of new conduits, wiring, and junction boxes as necessary. 3. Instrumentation, Control, and Supervisory Control and Data Acquisition (SCADA) System: Migration of existing programmable logic controller (PLC) programming to new RTU panel PLC. Supplier shall integrate all process equipment into a PLC-based process control system designed to communicate with SCADA via a wired control system. Instrumentation and equipment will be delivered factory-integrated and tested. 4. Factory acceptance testing (FAT), site acceptance testing (SAT), performance testing, and compliance. 5. Startup and demonstration. Type of Award: Lump Sum 28569 - Misc. Electrical Equip/Sup NOC 69031 - Controls, Integrated Sys 91438 - Electrical 92838 - Electrical Maint/Rep 92941 - Engine/Motor Ind Maint/Rep 92961 - Motor Rewind/Repair Electric 94164 - Motor Maint/Rep, Vertical 94172 - Power Generat/Trans Ctrl Sys 96737 - Electrical/Electronic Products 99239 - Electrical Sys Testing Ser 99837 - Electrical Equip/Sup SoS Q&A Deadline: 03/15/2024 5:00 PM (PST) Contact Info: Kim Truong 650-903-6085 Work Commences May 13, 2024 Work Completion and Demobilization October 18, 2024 The newly constructed equipment shall be installed, tested, and commissioned prior to the Valley Water service outage with no exceptions. Liquidated Damages: If required, it is agreed by the Vendor that if the goods or services are not delivered complete, as called for in this Proposal, damages will be sustained by the City, and that it is and will be impracticable and extremely difficult to ascertain and determine the actual damage which the City will sustain in the event of and by reason of such delay; and it is, therefore, agreed that the Vendor will pay to the City the sum of Three Hundred Fifty Dollars ($350) per day for each and every calendar day delay in finishing the work in excess of the number of working or calendar days prescribed or in excess of the date specified for completion or delivery of the goods or services, whichever is applicable in this Proposal; and the Vendor agrees to pay said liquidated damages as herein provided; and in case the same is not paid, the Vendor agrees that the City may deduct the amount thereof from any moneys due or that may become due to the Vendor under this Proposal. Partial payments paid to the Vendor after the scheduled completion dates shall not be constituted as a waiver of the City's right to assess liquidated damages. Owner Rights: The City reserves the right to reject any and all bids or to waive any errors, discrepancies, or irregularities. The bid will be awarded at the discretion of the City Manager or designee (formal bids) or Purchasing Agent (all other bids) on an item-by-item basis or in any fashion that best meets the needs of the City. All blanks for unit prices must be completed. Bond Notes: The Vendor agrees to post a Faithful Performance Bond and a Payment bond for Labor and Material, or other guarantees, in the amount of the Purchase Order upon bond forms provided by City, guarantying the performance of the terms of this Agreement. The surety issuing bonds for the Vendor shall be approved by the U.S. Department of Treasury's Financial Management Service and shall be listed on the most current Treasury Circular 570 as contained in the Federal Register.

Award

Water / Sewer

$733,000.00

Public - City

Site Work

12

18

2

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
73
Bidding Soon
1,476
All Active Projects
636
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

May 13, 2024

img_map_placeholder

1960 Miramonte Ave, Mountain View, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.