Site work and paving for a road / highway in Ankeny, Iowa. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Est. Value: $ 844,045.00 The 2024 PCC Pavement Preservation Program - Crack and Joint Filling project includes the following: Site 1 - Full depth PCC patching and intake adjustments within the Georgetown, Ashland Meadows, and Prairie Ridge Estates neighborhoods. Site 2 - Cleaning and filling of cracks and joints in PCC street pavement within the Georgetown, Ashland Meadows, and Prairie Ridge Estates neighborhoods. Site 3 - Cleaning and filling of cracks and joints in PCC street pavement on NW Georgetown Boulevard from just east of NW Ash Drive to just west of the Veridian Credit Union driveway. The construction improvements include the cleaning and filling of approximately 81,000 LF of longitudinal joints, 63,000 LF of transverse joints, and 6,000 LF of miscellaneous cracks, full depth patching of approximately 500 SY of 7' thick PCC Class C-SUD pavement, one major adjustment to an intake, and five minor adjustments to intakes. Other associated improvements include temporary traffic control, temporary surface restoration, mobilization, and miscellaneous associated work necessary to complete the project. Work on the improvements for Site 1 shall be commenced any time after a written Notice to Proceed is issued, no earlier than April 15, 2024 and no later than May 13, 2024. Work on the improvements for Site 2 shall begin upon full completion of Site 1 but no later than July 8, 2024. Work on the improvements for Site 3 shall begin no earlier than May 28, 2024 and no later than July 29, 2024. Work on all three Sites shall be completed as stated below. The Contractor shall perform the work for Sites 2 and 3 only when the ambient air and pavement surface temperatures are above 40' Fahrenheit and below 85' Fahrenheit, unless otherwise approved by the Engineer. The Notice to Proceed will be issued after the preconstruction conference, which is expected to occur in April 2024. Each Bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as securit that the successful Bidder will enter into a Contract for the work bid upon and will furnish after the award of Contract a corporate Surety Bond, in a form acceptable to the City of Ankeny, for the faithful performance of the Contract, in an amount equal to one hundred percent (100%) of the amount of the Contract. The Bidder's security shall be in the amount fixed in the Instructions to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a Bid Bond on the form provided in the Contract Documents with corporate Surety satisfactory to the City of Ankeny. The bid shall contain no condition except as provided in the specifications. Each successful Bidder will be required to furnish a corporate Surety Bond in an amount equal to one hundred percent (100%) of its Contract price. Said Bond shall be issued by a responsible Surety approved by the City of Ankeny and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the City of Ankeny from claims and damages of any kind caused by the operations of the Contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of two (2) years from and after acceptance of the Contract. The Contractor shall fully complete the improvements for Site 1 within twenty (20) working days. Full completion for Site 1 shall be defined as all Site 1 work including punch list items completed, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work in this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for Site 1 work not fully completed within the designated Contract term(s). The Contractor shall fully complete the improvements for Site 2 no later than November 1, 2024. Full completion for Site 2 shall be defined as all Site 2 work including punch list items completed, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work in this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for Site 2 work not fully completed within the designated Contract term(s). The Contractor shall fully complete the improvements for Site 3 within ten (10) working days. Full completion for Site 3 shall be defined as all Site 1 work including punch list items completed, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work in this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for Site 3 work not fully completed within the designated Contract term(s). The City of Ankeny does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City.

Bid Results

Roads / Highways

$844,045.00

Public - City

Paving, Site Work

98

9

8

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
40
Bidding Soon
570
All Active Projects
255
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2024

April 15, 2024

img_map_placeholder

Multiple Locations, Ankeny, IA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.