BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a power facility in Sutherland, Nebraska. Completed plans call for the renovation of a power facility.

REHEAT VERTICAL OUTLET REPLACEMENT UNIT 1 BOILER, for Gerald Gentleman Station. The scope of work covered under this Contract is intended to be a "turnkey" installation by the CONTRACTOR. The CONTRACTOR shall be responsible for the procurement and supply of all needed labor, services, material, components, and equipment to fabricate, construct, transport, unload, demolish and install the needed material, components, and equipment. The design, engineering, fabrication, and supply ofthe following components: Any insulation and lagging required to complete the replacement of the Reheater Vertical Outlet Bank. Replacement of the DISTRICT'S GGS Unit 1 boiler's Reheat heating surface area according to given spec in SECTION G - PART V. Analysis and, if deemed necessary and with DISTRICT approval, modification of DISTRICT'S existing GGS Unit 1 Boiler's Reheat inlet header orificing based upon OEM modeling and/or analysis with EPRI best practices utilizing internal tube oxide thickness readings. An approximate two (2) foot wide by seventy-one (71) foot long section of crown seals and roof casing enclosing the support tube penetrations. An approximate two (2) foot wide by seventy-one (71) foot long section of heat recoverey area (HRA) rear wall penetration refractory and seal components into Reheat Outlet Header Vestibule. Remove and re-install all insulation and lagging required to complete the Reheat Vertical Outlet Bank Replacement. Install the identified replacement components and equipment as specified by the Contract. Test the installed components and equipment under this Contract to ensure they meet required performance guarantees. (NOTE: The exception to this is the performance of the boiler Reheat Pressure test which the DISTRICT will perform). The selected forklift shall be capable oflifting all indoor and outdoor materials provided under this Contract. Demolish the identified components and equipment as specified in these Contract Documents and move them to a DISTRICT designated site location or disposal area

Sub-Bidding

Power Plant

$90,000.00

Public - State/Provincial

Renovation

24

7

4

4

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
3
Bidding Soon
32
All Active Projects
13
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2024

December 12, 2024

img_map_placeholder

6089 NE-25, Sutherland, NE

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.