BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2024 at 8:00 PM

Updated May 24, 2024

Site work, paving and outdoor lighting for a mixed-use development in Maynard, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and for outdoor lighting for a road / highway.

The work consists of construction of a traffic signal, pedestrian signals, roadway milling, pavement overlay, sidewalk, curbing, pedestrian curb ramps, signage, pavement markings, and pedestrian crossing equipment. There are three add alternates for this project. Traffic Signal Installation, Pavement Resurfacing, and Pedestrian Improvements. Traffic Signal and Roadway work in the Town of Maynard, MA during the 2024 construction season. The work consists of construction of a traffic signal, pedestrian signals, roadway milling, pavement overlay, sidewalk, curbing. pedestrian curb ramps, signage, pavement markings, and pedestrian crossing equipment. There are three add alternates for this project. The bid must include a hid deposit equal to 5% of the bid price, the deposit shall be in the form of a bid bond or check made payable to: Town of Maynard. Award Date: Award will be made within (thirty) 30 days after bid opening unleas otherwise stated in the specifications or the time for award is extended by mutual consent of all parties. All bids submitted shall be valid for a minimum period of sixty (60) calendar days following the date established for acceptance. Based on the Town's availability of funds, Contractor may start work any time after a signed Notice to Proceed is issued by the Town, however, no Applications for Payment may be submitted by the Contractor to the Town until on or after June 1, 2024. Questions concerning this IFB must be submitted via email only to Mr. Justin DeMarco, DPW Director, idemarco townofmaynard.net and Mr. Wayne Amico, Town Engineer, at wamico townofmaynard.net, before close of business on 3/26/2024 at 4 PM. Questions shall be delivered via email only. Written responses will be emailed to all bidders on record having requested the bidding documents through online The Town reserves the right to accept or reject any and all bids, wholly or in part, and to award a bid deemed in the best interest of the Town of Maynard.

Award

Roads / Highways

$697,551.00

Public - City

Outdoor Lighting, Paving, Site Work

23

5

29

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
617
Active Projects
248
Bidding Soon
4,657
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

May 2, 2024

Project location map

Concord St, Maynard, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.