Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 1, 2024 at 8:00 PM

Updated July 2, 2024

Site work and paving for a mixed-use development in Conroe, Texas. Working plans call for site work for a 141,657-square-foot road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Scope of work includes adding shoulders, replacing asphalt with concrete, a center turn lane, sidewalks, a shared use path and drainage improvements. As of July 1, 2024, this project has been let. Engineering work was handled by the owner and a general contractor has been selected. A firm construction timeline has not been established but is unlikely to begin before Q3 2024.

Pre-Construction/Negotiated

Roads / Highways

$36,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
391
Active Projects
183
Bidding Soon
4,090
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2024

Project location map

FM1314, Conroe, TX

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed