Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 11, 2024 at 8:00 PM

Updated March 27, 2024

Renovation of an educational facility in Colby, Kansas. Completed plans call for the renovation of a educational facility.

The selected vendor will be responsible for delivering and installing the flooring as outlined below. CCC is Responsible for Removing and disposing of any current carpet and linoleum. Completing any electrical or plumbing work associated with the project. The Vendor is Responsible for Inspecting each of the living areas prior to submitting a bid. Verifying all measurements. Providing written manufacturer warranty information and product specification sheets from the manufacturer for products specified. Ensuring the existing concrete flooring is properly sealed prior to installation. Describing how its flooring selection will benefit CCC's goal of a campus with a matched blending of flooring. Providing a realistic documented timeline that encompasses, at a minimum, ordering, receiving, verifying, delivery, and installation. (For consistency, CCC requests that vendors provide a Gantt chart or something similar.) Coordinating and finalizing color selections upon the award of the contract. Replace Flooring in Student Housing. Direct Questions to nikol.nolan@colbycc.edu.

Post-Bid

Educational

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
2
Bidding Soon
83
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2024

April 25, 2024

Project location map

1255 S Range Ave, Colby, KS


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed