BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Austin, Texas. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Scope of Work: The Work generally consists of providing the following services, including but not limited to installation and upgrade of storm drain pipes, culverts, inlets, junction boxes, storm drain outfalls, limited repair of storm water pond embankments, limited construction of channel and bank stabilization measures, including: o Construction of storm drain pipes and box culverts in ROW and drainage easement o Construction of storm drain inlets o Removal of storm drain systems o Roadway repaving, sidewalk reconstruction o Traffic control o Revegetation in drainage easement o Installation and/ or repair of storm drain outfalls o Limited channel stabilization associated with storm drain improvement project o Utility relocation including water, wastewater, electric and cable as needed o Construction of mechanically stabilized walls using natural limestone block. o Construction of mechanically stabilized and vegetated slopes using turf reinforcement matting, geogrid, and soil. o Placement of rock riprap and limestone block grade control structures within a channel bed. o Repair of storm drain outfalls in channels. o Limited replacement or repair of storm drains within the right-of-way, associated with a channel stabilization project. o Construction within active stream channels with close attention to erosion controls and care of water. o Relocation of fish in dewatered channels. o Repair of storm water pond embankments. o Dewatering of storm water ponds. o Sediment removal within storm water ponds. o Repair of outfall structures and outfall channels downstream of storm water ponds. o Decompaction and revegetation of disturbed areas with native grasses MBE/WBE Goals: African American - 2.82% Hispanic - 4.11% Asian/Native American - 0.21% WBE- 1.68% Project Estimate: NTE $1.5M for initial contract term of 12 months. 3 possible 12-month extensions at NTE $1.5M each for a total potential contract amount NTE $6M

Bid Results

Water / Sewer

$6,095,375.00

Public - City

Paving, Site Work

18

16

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
148
Bidding Soon
3,627
All Active Projects
1,356
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.