BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2025 at 8:00 PM

Updated September 18, 2025

Site work for a water / sewer project in Barrington, Illinois. Working plans call for site work for a water / sewer project.

As of September 17, 225 an engineer has been selected for the project. Construction is estimated to start July, 2026. *The closed solicitation has been included below for reference: Qualified engineering firms to assist with the design of upgrades at the Village wastewater treatment plant (WWTP.) Upgrades include new wastewater process equipment, concrete coatings, underground piping, manhole coatings, and electric gear. All disadvantaged and other businesses interested in providing a proposal for this work should contact Mr. Kevin Fecske at the Village to discuss this opportunity. The method of Contractor Selection has not been Determined at this time.

Final Planning

Water / Sewer

$350,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
539
Active Projects
291
Bidding Soon
3,864
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2026

Project location map

Multiple Locations, Barrington, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.