BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Littleton, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Furnish all labor, materials and equipment required as additional work for completion of the project. The work shall include, but is not necessarily limited to, all cutting, filling, compacting of fills and rough grading required to bring project areas to grade. The work shall include, but is not necessarily limited to, earthwork which shall include excavating, filling, compacting, grading and related items. Excavate and fill to elevations and dimensions indicated on the drawings and on the site. Allow additional space as required for construction operations. The work shall include, but is not necessarily limited to, furnishing and placing a hot bituminous asphalt pavement to the depth shown on the drawings. The work shall include, but is not necessarily limited to, maintaining a clear and concise set of construction documents clearly indicating changes to the original project design. Contractor shall provide all necessary measurements, survey, and product changes to indicate As-Constructed conditions for the each element of the project. The work shall include, but is not necessarily limited to, placement of compacted aggregate upon the previously prepared surface. Written questions due march 21st, 2024 at 5:00pm Notice of award march 28th, 2024 Notice to proceed april 22nd, 2024(tentative) LIQUIDATED DAMAGES: The parties agree that time is of the essence of the Contract and of the Specifications wherever a definite and certain length of time is fixed for the performances of any act. A daily charge will be made against the Contractor for each calendar day that any work remains uncompleted after the elapse of contract time. This daily charge will be deducted from any money due to the Contractor. This deduction will not be considered a penalty, but as liquidated damages. The liquidated damages set forth is an amount, agreed to by the Contractor and the Division, as reasonably representing additional project construction administration costs incurred by the Division and projected loss of revenue to the Park if the Contractor fails to complete performance within the contract time. For this project, the Liquidated Damages will be $531.60 per day. Owner Rights: If all bids exceed such amount, the right is reserved to reject all bids. The Division of Parks and Wildlife reserves the right to reject any or all proposals, to waive informalities, and to accept any proposal deemed desirable. The Division may request personal interviews, and retains the right to reject the proposed candidates without reservation. If a candidate is rejected, the Contractor shall provide an alternative that is acceptable, and work shall not begin until approval is obtained. The state reserves the right to reject any changes suggested to PO or Contact terms and conditions and award to the next most advantageous qualified responsive vendor. Bond Notes: A five-percent (5%) Bid Bond, certified check, or cashier's check is required with bid proposals of $50,000.00 or more. PERFORMANCE BOND, LABOR AND MATERIAL BOND: The successful bidder shall furnish a bond in the amount of 100% of the contract price for performance and for material and labor payment when bid is equal to or exceeds $150,000. The bond shall be executed on the standard State of Colorado form. The State requests that the Surety and Contractor leave the date of the Contract found on the first page of each bond form, blank and we will 'pen' in the date after the Controller executes the Contract. These bonds will be submitted along with the standard State Agreement form within 10 days of the "Notice of Award. Project Coordinates: Latitude: 39°33'48.63"N Longitude: 105° 2'8.12"W View Google Map Location – https://www.google.com/maps/dir//Colorado+Parks+and+Wildlife+-+Littleton+Office

Post-Bid

Sidewalks / Parking Lot

$2,000,000.00

Public - State/Provincial

Paving, Site Work

1

1

46

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
73
Bidding Soon
960
All Active Projects
419
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2024

May 31, 2024

img_map_placeholder

13787 US-85, Littleton, CO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.