Published April 24, 2024 at 8:00 PM

Updated April 25, 2024

Site work for a power facility in Austin, Minnesota. Completed plans call for site work for a power facility.

Est. Completion Date: Dec. 16, 2024 The general nature of the work on which bids will be received consists of construction additions to an existing substation site. The work consists of installation of concrete foundations, conduit, ground grid, power and control cable, buswork, and miscellaneous equipment at the Murphy Creek Substation, Austin MN. The project also includes installing an Owner-furnished 69 kV circuit breaker, steel, and switches. The above work shall be in accordance with the specifications and proposed form of contract now on file in the office of Austin Utilities, Austin, Minnesota, by this reference made a part hereof, as though fully set out and incorporated herein. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Bid Results

Power Plant

$1,475,000.00

Public - City

Site Work

49

15

14

6

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
34
Bidding Soon
474
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

June 3, 2024

Project location map

To Be Determined, Austin, MN

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed