BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 25, 2024 at 8:00 PM

Updated April 26, 2024

Site work for a playground / park / athletic field in Albion, Nebraska. Completed plans call for site work for a playground / park / athletic field.

Eli Porter Memorial Inclusive Playground Project. Fuller Park is a 6-acre site that is home to the Albion Family Aquatic Center as well as other recreation assets such as play equipment and picnic shelters. The City of Albion does not currently have accessible and inclusive play structures in their recreation asset profile. The Eli Porter Memorial Project is intended to create an inclusive play space for area citizens as well as those visiting our community. The City of Albion has already received informal proposals for this project and has developed the project budget based upon these preliminary proposals. Each proposal shall include: 1. One (1) original and Five (5) copies. 2. A single total project cost including a detailed itemized breakdown of all charges. 3. Minimum 11x17 color rendering of the design. 4. Plan sheets showing entire design with dimensions. Minimum size of 11x17. 5. List of design components. 6. Copy of manufacturers warranty and liability coverage. 7. Contractor information that will be providing professional installation services. 8. Accessibility summary. 9. List of 3 references with contact information. 10. Approximate installation date Project Schedule RFP Issued: March 1, 2024 Proposals Due: March 22, 2024 by 2:00 pm City Review Process: March 25 April 4, 2024 Council Approval: April 9, 2024 Installation Date: Spring/Summer 2024

Award

Playgrounds / Parks / Athletic Fields

$430,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
24
Bidding Soon
330
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2024

April 22, 2024

Project location map

To Be Determined, Albion, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.