BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Pleasanton, California. Working plans call for the renovation of a fire / police facility.

***As of September 20, 2024. All bids rejected due to over the budget. rebid date not available at this time. Additional Pre bid meeting note: If any bidder wishes to conduct site visit(s) at any other stations, the Project Manager will walk any/all stations during normal business hours the week of March 21March 28, 2024, upon request. To allow for scheduling and notification of all bidders, please send your requests to William.Washburn@acgov.org at least 5 business days in advance. The Project consists of: The current Station Alerting system used as the primary communications system between Dispatch and Fire Stations is outdated. ACFD has selected a new station alerting system, the Phoenix G2 Communication System, made by Honeywell. The new system needs to be installed at 37 Fire Stations (see table below). This RFP is seeking a service provider who can perform installation construction services such as run communication wires, wall patching, and install additional outlets. installation and testing the new system. The installation and testing portion must be performed by a G2-certified installer and validated by manufacturer Installation will occur in two phases, as provided in Document 00 01 20 List of Schedules. All buildings listed in the Table in Section 5 will need to have new communications cables (Cat 6 wire) run between the main server area to terminal destinations. It is expected that each cable will be labeled and fitted with RJ45 connectors at both ends to facilitate final equipment installation and hook-up by G2-certified installer. Cable color should be specific to Phoenix G2 system. This color should be different than current Cat 5/6 cabling already present in fire stations. Note that different buildings made from different materials may require different approaches to installing the required cable. Some limited number of buildings may not have the appropriate dedicated 20A outlet needed for final equipment operation. In such cases, an electrician may be needed to change out an existing outlet or install a new one and should include circuit wiring to the electrical panel, if needed. ACFD anticipates that this may only be necessary in some of the older buildings. All questions about the meaning or intent of the Contract Documents are to be directed in writing, including by e-mail, to County. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Fire / Police

$2,511,154.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
371
Active Projects
193
Bidding Soon
3,492
All Active Projects
1,391
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 7, 2024

March 14, 2025

June 24, 2025

img_map_placeholder

3560 Nevada St, Pleasanton, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.