BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Wichita, Kansas. Completed plans call for site work for a water / sewer project.

All box culvert, storm sewer, duct bank, waterline and sanitary sewer excavation under proposed pavement shall be sand filled and flushed (jetted and vibrated) per City Standard Specifications (section 801), unless flowable fill or other improved backfill material is otherwise specified. The sand fill shall start at the top of improved bedding and be brought up uniformly to an elevation 12 inches above the top of pipe, or 2 feet below the bottom of proposed pavement, whichever is higher. However, in no instance shall the sand fill be brought up to less than 6 inches below the pavement subbase material. Storm sewer adjacent to the back of curb and sanitary sewer in front and side lots shall also be sand filled per this provision, to within 2 feet of final grade. All costs for sand filling and flushing shall be included in the unit price bid for "Fill, Sand (Flushed & Vibrated)". This item shall be paid for at the unit price bid per linear foot of trench filled, regardless of trench depth and/or pipe size, unless indicated otherwise by the plans or contract. A bid bond in the amount of five percent (5%) Of the total bid or an annual bid bond is required prior to bid Opening. The Contractor shall read and fully comprehend every aspect of the contract provisions included in this bid proposal, prior to submitting a bid for the project. Any questions prior to bid submittal should be directed to Joe Hickle, P.E., Stormwater Engineer, at (316) 268-4307 or jhickle@wichita.gov Approximate award date 04/02/2024 12:00 AM (UTC-06:00) Central Time (US & Canada) There will be no pre-bid conference. Question Deadline 03/15/2024 Bidder questions must be submitted by email to the Engineer by one week prior to bid date. All work on the project shall be completed six months from the notice to proceed and not later than December 31, 2024. Working days will be charged as provided for in the Standard Specifications once the work order is issued. The non-availability of material shall not prevent working days from being assessed. If you need further assistance, please contact the Purchasing Office directly at purchasing@wichita.gov or by phone at 316-268-4636.

Post-Bid

Water / Sewer

$304,000.00

Public - City

Site Work

18

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
38
Bidding Soon
362
All Active Projects
153
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 22, 2024

April 22, 2024

December 31, 2024

img_map_placeholder

Multiple Locations, Wichita, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.