BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Palatine, Illinois. Completed plans call for the renovation of a educational facility.

All Questions Regarding the Bidding Documents Shall Be Submitted to the Architect via E-mail to Both Jewell Jackson (Purchasing@harpercollege.edu) and Emilie Hoffman (Ehoffman@woldae.com). Replies Will Be Issued to All Bidders of Record in the Form of an Addendum. Questions Received After March 18, 2024 at 12:00 P.m. May Not Be Answered. Bid Security in the Form of Bid Bond in an Amount Equal to Ten Percent (10%) of the Aggregate of the Base Bid Amount and All Alternate Bid Amounts Shall Be Submitted With the Bid. Performance, Labor and Material Payment Bonds, and Certificate of Insurance Will Be Required From the Successful Bidder. All Bidders Must Comply With Applicable Illinois Law Requiring the Payment of Prevailing Wages by All Contractors Working on Public Works. Bidder Must Comply With the Illinois Statutory Requirements Regarding Labor, Including Equal Employment Opportunity Laws. M. Contractors Shall Pay Not Less Than the Prevailing Rates of Wages to All Laborers, Workmen, and Mechanics Performing Work Under This Contract, and Shall Comply With the Requirements of the Illinois Wages of Employees on Public Works Act (820 Ilcs 130/1-12). Bidders Shall Comply With the Business Enterprise Program: Participation and Utilization Plan Developed by Harper College. There is a 30 Percent Aspirational Goal on the Contract. Any Bid Submitted Unsealed, Unsigned, Fax Transmission, E-mail, or Received Subsequent to the Aforementioned Date and Time, May Be Disqualified and Returned to the Bidder. The Work consists of The Project consists of the construction of remodeling an existing toilet room and surrounding areas to create an ADA compliant restroom.. Briefly and without force and effect upon the Contract Documents, the Work of this single prime Contract can be summarized as follows: Work under this Contract includes: 1. Interior Finishes: a. Insulated gypsum board/metal stud partitions. b. Floor finishes of epoxy painted and sealed concrete. c. Wall finishes of paint, ceramic tile and FRP. d. Ceiling finishes of acoustical lay-in tile, gypsum board. e. HM doors and frames, hardware, toilet accessories, miscellaneous specialties. 2. Mechanical Systems: a. Plumbing including, supply and waste piping systems, piping insulation, plumbing fixtures. b. Heating including piping, piping insulation. c. Ventilation to include ductwork, duct insulation, chilled water piping. 3. Electrical Systems: a. Conduit and wiring. b. Interior lighting. No Bid May Be Withdrawn for a Period of Ninety Days After the Submission Without the Consent of the Board of Trustees. Harper College Reserves the Right to Reject Any or All Bids or Parts Thereof, to Waive Any Irregularities or Informalities in Bidding Procedures, and to Award the Contract in a Manner Best Serving the Interest of the College. All work at Building B is to be completed between June 3, 2024 and August 30, 2024. All work shall be substantially complete by August 30, 2024. No time extensions shall be granted except for occurrence of unforeseeable conditions. Trade Contractors will be expected to expend cost for premium/ over time for additional crews, extended work days, second shift work, weekend and/ or holiday time, or for other means to bring the project back on schedule should Trade Contractors fall behind in achieving projected schedule milestones. There is a 30 percent aspirational goal on the Contract.

Post-Bid

Educational

$200,000.00

Public - County

Renovation

13

21

6

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
100
Bidding Soon
2,106
All Active Projects
909
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2024

June 3, 2024

img_map_placeholder

1200 W Algonquin Rd, Palatine, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.