BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2024 at 8:00 PM

Updated April 10, 2024

Demolition, site work, paving and addition to a bridge / tunnel in Clemson, South Carolina. Completed plans call for the addition of a bridge / tunnel; for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

A. Work included: To assure adequate planning and execution of the Work so that the Work is completed within the number of calendar days allowed in the Contract, and to assist the Engineer in appraising the reasonableness of the proposed schedule and in evaluating progress of the Work, prepare and maintain the schedules and reports described in this Section. B. Related work: 1. The drawings and Terms and Conditions of the Clemson University Contract for the Delivery of Construction Services and applicable parts of other specifications that require coordination with the work specified in this Section also apply to this Section. 2. Requirements for progress schedule: General Conditions. 3. Construction period: Form of Agreement. C. Definitions: "Day", as used throughout the Contract unless otherwise stated, means calendar day. Construct New Asphalt Parking Lot Extending from R4 and Connecting to C1. Construction Cost Range: $1,600,000 to 2,000,000 All questions about the project shall be submitted in writing to randerson@summitengineeringgroup.com before 3:00 pm on Tuesday, March 19, 2024. Final Addendum, if necessary, will be posted Friday March 21, 2024.

Post-Bid

Bridges / Tunnels

$2,000,000.00

Public - State/Provincial

Addition, Demolition, Paving, Site Work

46

13

14

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
5
Bidding Soon
786
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

May 27, 2024

Project location map

Multiple Locations, Clemson, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.