Renovation of a water / sewer project in San Francisco, California. Completed plans call for the renovation of a water / sewer project.
Please be advised that prior to receiving these materials, all requestors will be required to complete, sign, and comply with a Confidentiality Agreement. The objective of the project is to provide health and safety improvements, as well as electrical reliability, to SEP Primary Sedimentation Buildings. The work is to be performed in San Francisco, California. The Engineer's estimate is $20,000,000. Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B and Section 2.01 of CM D Attachment 1. There will be no LBE bid discounts for this contract. The Local Business Enterprise (LBE) subcontracting requirement is 15.00%. The LBE subcontracting requirement can only be met with CM D certified San Francisco Micro and Small-LBEs. The LBE subcontractor participation requirement for this Contract is below 20% due to the following: This project has a high level of complexity when it comes to the scope of work, primarily the electrical work. The contractor will be installing provisions to run SEP 040/041 during a power shut down to allow both maintenance and connections to an existing substation. This critical load system is comprised of a manual transfer switch, portable generator connection and a portable generator. The contractor will be required to install the critical load test the critical load equipment in a short window that is critical to WWE operation of the facility. During construction, the contractor will be required to coordinate and switch between permanent and temporary power, potentially more than once. Failure to properly transfer between temporary and permanent power can have severe operational consequences. This project also has many weather constraints. Since Southeast Plant (SEP) will be in operation during construction, work will have to be tailored to the dry and wet weather seasons and ensure the building is operational when required by WWE. Lastly, SEP has multiple projects occurring at the same time. This adds an even higher level of complexity since the contractor will have to coordinate with several different projects. SFPUC-LBEs cannot be counted towards meeting the LBE subcontracting requirement(s).Prime and Joint Venture level LBE participation cannot be counted towards meeting any of the LBE subcontracting requirement(s). LBE subcontractors must be certified with CM D in the scope of work they are being listed to perform. All Bidders shall submit documented Good Faith efforts with their Bids as directed on CM D Form 2B, except those who exceed the above-stated subcontracting requirement(s) by at least 35%. Refer to CM D Attachment 1. Failure to comply with Chapter 14B requirements may result in a Bid being deemed non-responsive and ineligible for Contract award. Please contact Adriana Duran at (415) 598-7368 or Adriana.duran@sfgov.org for further information. Subcontracting opportunities may include, but not limited, to the following major types of work: Class A General Engineering Contractor; C-10 Electrical; C-33 Painting and Decorating; D-6 - Concrete. Please refer to Section 01 60 00 in the Specifications regarding the purchase of equipment to achieve the LBE subcontracting participation requirement. SFPUC encourages Bidders to complete the Safety Prequalification Web Form at electronically at least 3-weeks prior to the date of Bid opening in accordance with Section 00 21 13 - Instructions to Bidders. Bidders are required to pass the Safety Prequalification prior to SFPUC considering their bid submission complete. SFPUC will notify Bidders that have passed the Safety Prequalification prior to or on the date of Bid opening. Refer to Section 00 21 13 - Instructions to Bidders, "Bidder Qualifications" and online for additional information. (B)A Class "A" California Contractors License is required to bid. Furthermore, each listed subcontractor must possess appropriate active licenses for the work each subcontractor will be performing. All questions above this line were received prior to the 10 days prior to bid deadline The LBE subcontracting participation requirement is 15%
Bid Results
Water / Sewer
$18,700,490.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
13
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 18, 2024
June 18, 2024
750 Phelps St, San Francisco, CA
Related To This Project
San Francisco, CA
--
San Francisco, CA
Bid Date: Mar 28 2024
San Francisco, CA
--
San Francisco, CA
Bid Date: Mar 20 2024
San Francisco, CA
Bid Date: Mar 22 2024
San Francisco, CA
--
San Francisco, CA
Bid Date: Apr 10 2024
San Francisco, CA
Bid Date: Apr 30 2024
San Francisco, CA
Bid Date: Mar 26 2024
San Francisco, CA
Bid Date: Apr 05 2024
San Francisco, CA
Bid Date: Apr 10 2024
San Francisco, CA
Bid Date: Apr 04 2024
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
Bid Date: Mar 06 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.