BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, asbestos abatement and renovation of a mixed-use development in Saint Louis, Missouri. Completed plans call for the renovation of a educational facility; for site work for a educational facility; for asbestos abatement for a educational facility; municipal facility; municipal facility; and municipal facility.

A. Bids may not be withdrawn for at least forty-five (45) days after the closing date for receipt of Bids. B. All Bids must be fully completed Bids by a Prime Contractor who shall have responsibility for all portions of the Work. C. Individual Bids by separate Contractors for separate portions of the Work will not be accepted Bidders Should Direct All Questions and Clarifications to the Owner's Representatie via Bonfire No Later Than 5:00 Pm, Wednesday, March 20, 2024. Direct Questions Regarding Access to or Data Entry Onto Bonfire To Karen Shannon at 314-415-8251 or Kshannon@parkwayschools.net A Bid Bond Will Be Required in the Amount of Five Percent (5%) of the Amount of the Contractor's Bid. Question Deadline 03/20/2024 at 5:00 PM CT Bidders Should Direct All Questions and Clarifications to the Owner's Representatie via Online. A. The Bid Bond Must Accompany the Bid in Order for the Bid to Be Accepted. 1.13 an Executed Contractor's Qualification Statement, Aia Document A305 Including a Quarterly or Annual Financial Statement Not Over Twelve (12) Months Old, Must Be Included as Part of the Contractor's Bid, in Order for The Bid to Be Accepted. It May Be Delivered via Bonfire Prior to the Bid Opening Date and Time. It is Anticipated That the Successful Contractor Will Be Given Notice to Proceed on or Before April 12, 2024 With Substantial Completion to Occur By Location on or Before: Pierremont Elementary School - June 7, 2024 Administration Building - June 19, 2024 Central High School - June 28, 2024 Mason Ridge Elementary School- July 15, 2024 Fern Ridge High School - July 19, 2024 A. The Contractor Will Be Allowed to Order Equipment, Materials, and Supplies as Necessary Upon Entering Into the Agreement Between Owner and Contractor. 1.15 It is Anticipated That This Agreement Will Be Presented to the Successful Contractor for Signature on or Before April 12, 2024. 1.16 Payments Will Be Made by the Owner Within Approximately Ten (10) Business Days, but No Later Than Thirty (30) Calendar Days After Receipt of Application and Certificate for Payment Which Receives Approval.

Post-Bid

Educational

$180,000.00

Public - County

Asbestos Abatement, Renovation, Site Work

35

9

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
27
Bidding Soon
817
All Active Projects
307
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2024

April 12, 2024

img_map_placeholder

Multiple Locations, Saint Louis, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.