Site work and outdoor lighting for a transportation facility in Turner, Montana. Completed plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.

**As of May 9, 2024, the project was awarded to Pavlik Electric in the amount of $304,640.** This work is to include all tools, equipment, materials and labor to complete this project. Bid Bond. All bids must be accompanied by lawful monies of the United States or a Cashier's Check, a Certified Check, Bid Bond, Bank Money Order or Bank Draft, drawn and issued by a National Banking Association located in the State of Montana, or by any Banking Corporation incorporated under the Laws of the State of Montana, in an amount equal to not less than ten (10) percent of the total bid, payable to the order of the Blaine County Airport Commission as liquidated damages in the event said successful bidder shall fail or refuse to execute the contract in accordance with the terms of his bid. Performance and Payment Bond. After a contract is awarded, the successful bidder will be required to furnish a separate Performance and Payment Bond, each in the amount of one hundred percent (100%) of the contract. The Owner reserves the right to reject any or all bids and to waive irregularities. The Bidder must supply all the information required by the bid documents and specifications. Contractors at every tier must comply with applicable federal requirements including but not limited to: the Buy American Preference, Civil Rights - General, Davis Bacon Requirements, Governmentwide Debarment and Suspension, Lobbying of Federal Employees, and Procurement of Recovered Materials as contained in the bid documents. The Contractor will be required to comply with the wage and labor requirements and to pay minimum wages in accordance with the schedule of wage rates established by the United States Department of Labor as referenced in the Contract. The Contractor's compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a) and its efforts to meet the goals. This item shall consist of removal of existing airport wind cones; furnishing and installing an airport wind cone per these specifications and per the dimensions, design, and details shown in the plans. The work shall include the furnishing and installation of a support for mounting the wind cone, the specified interconnecting wire, and a concrete foundation. The item shall also include all cable connections, conduit and conduit fittings, the furnishing and installation of all lamps, ground rod and ground connection, the testing of the installation, and all incidentals necessary to place the wind cone in operation (as a completed unit) to the satisfaction of the RPR. Bidders may not withdraw Proposals for a period of ninety (90) days after the bid opening date. Contract Documents. Contact person for this project is Cory Kesler (406) 495-3487 ckesler@mm.net. The Contract Documents consisting of half size Drawings and Project Manual may be viewed or obtained by either electronic documents on-line, or a hard copy at the office of MorrisonMaierle, Inc., 1 Engineering Place, Helena, Montana.

Award

Transportation Terminals

$304,640.00

Public - County

Outdoor Lighting, Site Work

15

9

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
1
Bidding Soon
9
All Active Projects
2
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2024

July 1, 2024

img_map_placeholder

225 1st St E, Turner, MT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.