BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

Field Service Center (FSC) Petroleum Storage Tanks Replacement Small Business Goal is 25%. BID SECURITY: Not less than five percent (5%) of the total bid price is required if the bid price is over $100,000.00. (See Instructions to Bidders, Paragraph D.) PERFORMANCE AND PAYMENT BONDS: A performance bond shall be required if the Contract amount is over $100,000.00. A payment bond shall be required if the Contract amount is over $25,000.00. Bonds shall be executed for one hundred percent (100%) of the value of the Contract. (See Contract Articles 'Performance and Payment Bonds' and 'Additional Bond Security' in Section III) A. The project name is FSC Tank Farm Modification located at 1215 Labco Street, Houston, TX. B. The Scope of Work shall include, but not be limited to, furnishing all labor, equipment, material, and incidentals necessary to provide a complete tear-off and installation. C. The Work identified in Paragraph 1.02 of this section is provided as a general outline for the Work and may or may not be inclusive of all work necessary to complete the project. D. The Scope of Work to be completed is indicated on the Drawings and by the requirements of each section of the Contract Forms, Conditions of the Contract, and Specifications. A. Establish staging areas according to the plans. Implement storm water pollution protection items. Establish safety procedures. Coordinate operating protocols with METRO facility staff. Obtain City construction permit. B. Tank Farm Replacement will include the following items: 1. The petroleum storage tank (PST) system replacement project shall include leak detection, tank gauging systems, emergency shutoff, automatic shutoff upgrades, and security fencing as well as other accoutrements. 2. Underground storage tank replacement. 3. Above ground storage tank replacement. 4. Automatic shutoff system replacement 5. Emergency shutoff system replacement. 6. Leak detection system replacement. 7. Automatic shutoff system for overfill in case of fire replacement. 8. Pipe replacement. 9. Automatic tank gauging system replacement. 10. Fuel cleaning systems installation. 11. Piping and piping trenches. 12. Loading and unloading spill containment devices. 13. Service lane dispenser replacement. 14. Installation of security fence. 15. Storm drainage facilities. 16. Other associated electrical systems. 17. Structural concrete pads. Questions Due Date: Apr 12th 2024, 4:00 PM CDT Liquidity Damages: Submit a final liquidated damages or incentive settlement statement, acceptable to METRO (If the contract or work authorization includes liquidated damages or incentives). Owner Rights: METRO expects the Contractor to have qualified trained and experienced document control staffing to perform the tasks. The Contractor shall inform METRO of the document control personnel assigned to the Project and METRO in its sole discretion shall have the right to reject any personnel whom the Contractor assigns to the Project. In advance of assigning any person to perform services, the Contractor shall inquire diligently into and screen for qualifications of each person whom Contractor assigns to perform services and Contractor shall not assign any person that poses a reasonable risk to the safety or property of METRO or its employees, and business partners.

Post-Bid

Water / Sewer

$230,000.00

Public - County

Site Work

36

16

25

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
342
Active Projects
221
Bidding Soon
4,275
All Active Projects
1,727
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.