Published May 17, 2025 at 8:00 PM
Updated May 18, 2025
Site work for a water / sewer project in Chouteau, Oklahoma. Completed plans call for site work for a water / sewer project.
Pre-solicitation Notice For Repair Tainter Valves at Various Locations Newt Graham, W.D. Mayo, and Chouteau Lock & Dams, OK This is a PRE-SOLICITATION NOTICE for the construction of the Repair Tainter Valves at Various Locations, at Newt Graham, W.D. Mayo, and Chouteau Lock & Dams, Oklahoma. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings. The U.S. Army Corps of Engineers - Tulsa has been tasked to solicit for and award a contract for the Repair Tainter Valves at Various Locations project at Newt Graham, W.D. Mayo, and Chouteau Lock and Dams, Oklahoma. The proposed design-bid-build project will be procured as a competitive small business set-aside, firm-fixed price contract in accordance with FAR 15, Negotiated Procurement, using the Lowest Price Technically Acceptable approach. Project Description: The scope of this project is to perform maintenance and repair work on the two 12' x 12' filling valves and two 12' x 12' emptying valves (per location) located at Newt Graham L&D, W.D. Mayo L&D, and Chouteau L&D. The valves will be pulled out for repair, undergo blasting and painting, and then reinstalled. The repair work will include the replacement of seals, backing/bearing bars, hardware, strut and trunnion assembly pins, bushings, keeper bars, and other necessary components. Additionally, certain valves may require casting build-up and line boring to address specific issues, such as worn castings where the valve connects to the strut. The work includes but is not limited to: Task 1: Valve Removal Coordinate with lock operations to determine suitable timeframes for removing two valves (upstream and downstream) on the same side of the lock chamber while keeping the lock operational. Develop a valve removal plan, including safety protocols, equipment requirements, and coordination with lock personnel. Disconnect and remove the valves from the strut and trunnion assemblies. Task 2: Valve Repair Assess the condition of each valve and identify specific repair requirements, such as seal replacement, backing/bearing bar replacement, hardware replacement, and strut and trunnion assembly maintenance. Address any casting issues, such as worn castings, through casting build-up and line boring as necessary. Conduct repairs using appropriate tools, techniques, and materials. Perform functional tests to ensure the repaired valves meet operational requirements. Task 3: Valve Blast and Paint Prepare the valves for blasting by cleaning and removing debris or contaminants. Conduct blasting to remove existing coatings, rust, and corrosion from the valve surfaces. Apply suitable protective coatings, such as primer and paint, to enhance durability and corrosion resistance. Task 4: Valve Reinstallation Coordinate with lock operations to determine suitable timeframes for valve reinstallation. Develop a valve reinstallation plan, including proper alignment and connection to the strut and trunnion assemblies. Install the repaired and painted valves, ensuring proper fit, alignment, and secure connections. Conduct operational tests to verify the valves' functionality after reinstallation. In accordance with FAR 36 and DFARS 236, the estimated magnitude of construction for this project is between $5,000,000 and $10,000,000. The North American Industry Classification System code for this procurement is 237990 (Other Heavy and Civil Engineering Construction) which has a small business size standard of $45M. Estimated duration of construction of this project is 365 calendar days. Anticipated solicitation issuance date is on or about 22 January 2025, and the estimated proposal due date will be on or about 25 February 2025. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Water / Sewer
$8,449,260.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 24, 2025
Multiple Locations, Chouteau, OK
Related To This Project
Chouteau, OK
Bid Date: Jun 03 2025
Chouteau, OK
Bid Date: Jun 09 2025
Chouteau, OK
Bid Date: Jun 18 2025
Chouteau, OK
Bid Date: Aug 19 2025
Chouteau, OK
Bid Date: Aug 08 2025
Chouteau, OK
Bid Date: Aug 05 2025
Chouteau, OK
Bid Date: Jul 24 2025
Chouteau, OK
Bid Date: Aug 05 2025
Chouteau, OK
Bid Date: May 28 2025
Chouteau, OK
Bid Date: Jun 03 2025
Chouteau, OK
--
Chouteau, OK
Bid Date: Jun 16 2025
Chouteau, OK
Bid Date: May 08 2025
Chouteau, OK
Bid Date: May 06 2025
Chouteau, OK
Bid Date: Apr 23 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.