BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in San Antonio, Texas. Completed plans call for site work for a playground / park / athletic field; for paving for a sidewalk / parking lot; and sidewalk / parking lot.

As of April 23, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Project Location - 733 E. ANSLEY STREET SAN ANTONIO, TEXAS 78221 900 RIGSBY AVENUE, SAN ANTONIO, TX 78210 This project consists of improvements to Bellaire and Highland Park. Construction Services to include demolition, site work, playground replacement, concrete flatwork, and park amenities. Construction to start first with Bellaire and then with Highland Park, due to Youth Summer program. Owner Rights: City reserves the right to delete line items prior to award. The Deadline for questions is scheduled for March 25, 2024 at 4:00PM (CT). Bond Notes: A good and sufficient Performance Bond in an amount equal to one hundred percent (100%) of the total Contract Sum, guaranteeing the full and faithful execution of the Work and performance of the Contract in accordance with Plans, Specifications and all other Contract Documents, including any extensions thereof, for the protection of City. This Performance Bond also shall provide for the repair and maintenance of all defects due to faulty materials and workmanship that appear within a period of one (1) year from the date of final Completion or acceptance of the Work by City, or lesser or longer periods as otherwise may be designated in the Contract Documents. PAYMENT BOND. A good and sufficient Payment Bond in an amount equal to 100% of the total Contract Sum, guaranteeing the full and prompt payment of all claimants supplying labor or materials in the prosecution of the Work provided for in the Contract, and for the use and protection of each claimant. LIQUIDATED DAMAGES reflect the daily monetary compensation, as designated in the Project's solicitation documents, to be paid to City by Contractor for losses/damages incurred by City as a result of Contractor's failure to achieve the contractual dates for Substantial Completion and/or Final Completion of the Project.

Bid Results

Playgrounds / Parks / Athletic Fields

$638,000.00

Public - City

Paving, Site Work

28

5

6

8

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
25
Bidding Soon
1,953
All Active Projects
762
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2024

May 9, 2024

img_map_placeholder

Multiple Locations, San Antonio, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.