Published April 12, 2024 at 8:00 PM

Updated April 13, 2024

Site work for a water / sewer project in Midvale, Utah. Completed plans call for site work for a water / sewer project.

This Project consists of the construction of two different drinking water pipeline replacement projects in Midvale, Utah. The High Tech Drive waterline project consists of roughly 2,173 feet of 8-inch diameter PVC pipeline. The Center Street project consists of about 745 feet of 8-inch diameter PVC pipeline to be installed between just outside of UTA Trax property and State Street. The projects also include replacing existing water services, furnishing and installing fittings, fire hydrants, and miscellaneous appurtenances. Question Deadline 03/18/2024 at 3:00 PM MT Any questions regarding how to use the U3P program, including how to submit a bid, download and upload documents, etc. should be directed to sciquestadmin@utah.gov or call the U3P supplier support at: 1-800-233-1121. Bid security in the amount of five (5) percent of the Bid must accompany each Bid. Midvale City reserves the right to reject any or all bids or to waive any informality or technicality in any bid if deemed to be in the best interest of the City.

Award

Water / Sewer

$4,000,000.00

Public - City

Site Work

19

13

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Construction Surveying, Execution, Application, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Equipment, Water Service Connections
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
30
Bidding Soon
617
All Active Projects
265
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

May 20, 2024

img_map_placeholder

Multiple Locations, Midvale, UT

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

2024 Pipeline Projects: High Tech Drive & Center Street

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.