BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Miami, Florida. Completed plans call for site work for a water / sewer project.

Scope of Work: (Contractor must obtain and submit all permits prior to performing any work.) The project consists of providing all labor, equipment, and supplies to perform: One (1) installation of protective structure along a 113 LF section of existing pipeline, consisting of 9,720 SQF of geotextile mat, Articulation Concrete Mat (ACB), 360 CY of riprap bubble and 60 CY of washed stone; and two (2) installation of protective structures along a 50 LF. Section of existing pipeline consisting of 4,300 SQF of geotextile mat, ACB mat, 160 CY of riprap rubble and ok30 CY of washed stone at the Central District Wastewater Treatment Plant (CDWWTP) 120" ocean outfall pipeline. The permanent repair includes the installation of articulated concrete block mats. The work of this project includes, but is not limited to, immediate mobilization; providing the services of commercial divers; complying with OSHA requirements; furnishing and installing materials for the repair; furnishing and installing materials necessary to provide scour protection on exposed areas of the Central District Wastewater Treatment Plant (CDWWTP) 120" ocean outfall pipeline. The project consists of the excavation of trenches, preparation of area immediately adjacent to exposed pipe, furnishing and installation of geotextile, furnishing and installation of washed rock, furnishing and installation of Articulated Concrete Block (ACB) Mats, connection of mats to each other and connection of new mats to existing adjacent mats, if present, and furnishing and installation of riprap armor in trenches overlying ACB, and removal of debris incidental to the construction. Two areas are to be repaired consisting of an approximate 84-foot length near Station 47+50 and an approximate 103-foot length near Station 130+00. The two locations at Stations 47+50 and 130+00 are located at coordinates (25 44'39.9''N, 80 06'55.1''W) in a depth of approximately 22 feet and at coordinates (2544'34.9''N, 80 05'24.7''W) in a depth of approximately 43 feet, respectively. Stations 47+50 and 130+00 are approximately 9,135-ft and 17,366-ft offshore from the CDWWTP in Virginia Key, Miami-Dade County, Florida.

Post-Bid

Water / Sewer

$2,101,692.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
58
Bidding Soon
1,081
All Active Projects
432
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.