Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a bridge / tunnel in Covington, Louisiana. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Tammany Trace Bridge #25 over the Abita River was inspected in 2022 and found to be in very poor condition and in need of repairs. While no major issues were found on the deck, 40% of the structure's 110 pile supports were found to be in poor or critical condition. Termite activity was also noted in some of the bridge's cap supports. The Engineering Department requisitioned a consultant in 2023 to develop preliminary plans for bridge replacement. It is anticipated that final plans will commence and be completed in 2024. Grant application support is included in the consultant's scope of work, but no grant funding is guaranteed. Should grant funding become available, a match for construction would be needed and it is not anticipated that the grant source will pay for engineering design services. It is anticipated that construction will commence in late 2024. Project will conduct surveys, environmental studies, geotechnical analysis, engineering design, and provide construction budget to construct a replacement structure for the Tammany Trace Bridge #25 over Abita River. Project is in preliminary design and will need additional funding in order to begin final design. This project is included in the Saint Tammany Parish's FY 2024-2028 Capital Improvement Program. As of March 19, 2024, further details regarding firm construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Bridges / Tunnels
$2,044,800.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
September 2, 2024
To Be Determined, Covington, LA
Related To This Project
Covington, LA
--
Covington, LA
--
Covington, LA
--
Covington, LA
--
Covington, LA
--
Covington, LA
--
Covington, LA
--
Covington, LA
--
Covington, LA
--
Covington, LA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--