Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Seatac, Washington. Contact the soliciting agency for additional information.
The Work includes Mechanical Plumbing and HVAC work for various locations at SeaTac International Airport and Seaport properties. Within 72 hours (3 business days) of receiving written request from the Port of Seattle, the Contractor shall furnish all cost estimates, which shall contain estimates for labor, tools, equipment, materials, and incidentals necessary to perform work as required by the Work Authorization (WA). Work will generally be requested on a day by day or weekly basis, but emergency response capability is also required. When emergency requests are made, one or more equipped trade workers must report to the designated job site within a time not to exceed two (2) hours from the time the Port Construction Manager calls the Contractor. In order to satisfy the demand of the anticipated contract workload, the Contractor is required to have an appropriate and reasonable number of badged employees, within the trade, of who two (2) or more must be Air Operations Area (AOA) qualified drivers. The contractor must ensure adequate workforce to fulfill the scope of work outlined in each Work Authorization. This includes providing sufficient employees capable of completing tasks within specified time frames, as per each Work Authorization's project demands. The contractor shall maintain staffing capacity to accommodate fluctuations in workload and ensure timely completion of services. It is anticipated that the Contractor will be issued multiple contractor Work Authorizations against this Contract, however, the Port of Seattle does not guarantee any minimum amount of work associated with this Contract or that the combined value of any contractor Work Authorizations issued under this Contract will exactly total the Contract amount. The Contractor shall furnish all labor, tools, equipment, materials, and incidentals necessary to perform the work as requested by the Port of Seattle via a Work Authorization. All Contractor labor shall be provided as defined by the labor classifications per the Schedule of Unit Prices listed in Document 00 41 00 - Bid Form. Bond Notes: Performance and Payment bonds will be required with the Contract. Each bond shall be in the full amount of the contract sum. No bid bond is required. The contract will be awarded for an estimated amount not to exceed $350,000, which excludes Washington State Sales Tax. The contract will last one (1) year, 365 calendar days, from the official contract award date, which is the date the Port of Seattle signs the Agreement, or until the contract amount is depleted, whichever comes first. This contract contains an option to extend the contract time up to 12 months beyond the original contract completion date. Labor and Industries require a "Statement of Intent to Pay Prevailing Wages" and "Affidavit of Wages Paid". The expense of such is the responsibility of the Contractor. If the Port exercises its option to extend the contract an additional year, then new Intents and Affidavits will be required for the additional contract year at the prevailing wage rates published at that time. The contract rates will be amended to reflect the changes in prevailing wage, if any. A portion of this Contract requires work to be performed within an area of the Airport controlled for security reasons. All Contractor personnel working in restricted areas (including AOA, Secured, SIDA and Sterile areas) on this project shall have Port of Seattle airport-issued identification / access badges in accordance with Title 49, Code of Federal Regulations (CFR), Part 1540/1542 and the Airport Security Plan. Bidders should consider the impact of acquiring badges when preparing their bids. This Contract requires work to be performed within an area of the Seaport controlled for security reasons. That area is defined as the area within a Coast Guard Regulated facility subject to the provisions of the Maritime Transportation Security Act (MTSA) of 2002 and Title 33 CFR, Part 105, delineated by security fence, and all other restricted areas indicated on applicable drawings, or as posted on the Seaport premises ("restricted/secured area"), or otherwise defined under each Terminal Facility Security Plan. No Contractor personnel are allowed to work in these restricted areas without a valid TWIC. Owner Rights: The Port reserves the right to reject any and all bids, to waive any informality, to accept any alternate bids, and to make such award that it deems to be in its best interest and pursuant to the terms of the General Conditions. Contract time extends from Execution of the contract through Completion as defined in the General Conditions. The Port of Seattle is an Equal Opportunity Employer and encourages Disadvantaged Business Enterprises, Minority Business Enterprises, Women Business Enterprises and Small Business Enterprises to participate in the competitive bidding process.
Post-Bid
Transportation Terminals
$350,000.00
Public - County
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 21, 2024
April 22, 2024
Multiple Locations, Seatac, WA
Related To This Project
Seatac, WA
Bid Date: Apr 02 2024
Seatac, WA
Bid Date: Apr 30 2024
Seatac, WA
Bid Date: Apr 19 2024
Seatac, WA
Bid Date: May 28 2024
Seatac, WA
Bid Date: May 07 2024
Seatac, WA
Bid Date: May 15 2024
Seatac, WA
Bid Date: May 10 2024
Seatac, WA
Bid Date: May 30 2024
Seatac, WA
Bid Date: Mar 27 2024
Seatac, WA
Bid Date: Mar 27 2024
Seatac, WA
Bid Date: Mar 12 2024
Seatac, WA
Bid Date: Mar 19 2024
Seatac, WA
--
Seatac, WA
Bid Date: Mar 05 2024
Seatac, WA
Bid Date: Aug 05 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.